My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
1206
>
2300 - Underground Storage Tank Program
>
PR0231175
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2019 11:43:33 AM
Creation date
3/29/2019 11:38:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0231175
PE
2361
FACILITY_ID
FA0001247
FACILITY_NAME
ARCO #7147
STREET_NUMBER
1206
Direction
E
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
1206 E MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Joaquin ValleyHEALTHY AIR LIU ' <br /> W7 LIVING' <br /> w;rw heaithyalrliving com <br /> AIR POLLUTION CONTROL DISTRICT Make one change for clean air.' <br /> TP-201.1C/D <br /> Leak Rate of Drop Tube/Drain Valve Assembly and Leak Rate of Drop Tube Overfill Protection <br /> Devices and Spill Container Drain Valves Report Form <br /> Permit Number.N-8850 Test Company:Gettler Ryan Inc. <br /> Site Name:Arco 7174 Technician:Alexander Tate <br /> Site Address:1206 E.March Lane Certification Number Expiration Date <br /> City:Stockton zip:95210 District:SJV-0273 6/30/2019 <br /> Datc/Time of Test:2/7/2019 8 am <br /> DROP TUBE DRAIN VALVE AND OVERFILL PROTECTION DEVICE PRESSURE INTERGITY TEST <br /> p Straight Drop Tube' p Drop Tube with an Overfill Protection Device' <br /> Pressure measuring device — <br /> Eldigital manometer ❑ mechanical gauge <br /> Calibration date for pressure measuringdevice (must be within 180 days of the test) 1/15/2019 <br /> Ending value for digital manometer drift test if applicable (must be 0.01 in.w.c.or less) 1/15/2019 <br /> Drop Tube Drain Valve Pressure Test: Drop Tube Overfill Device Pressure Test: "Corrected"Overfill Device Leak Rate <br /> Flom rate 80 WIndrr Flom rate 200 milmiu <br /> Time to reach 2 in. Drain valve Final Time to reach 2 in. Overfill Final Overfill Aflnus Equals <br /> w.c.at 80 ml/min leak rate pressure w.c.at 200 ml/min leak rate' pressure Device Drain Valve Corrected <br /> Leak Rate Leak Rate Leak Rate <br /> Tank Grade mins. ml/min in.w.c. mins. ml/min in.w.c. ml/min ml/min ml/min <br /> 1 87 2.31 10ml 2.01 <br /> 2 91 2.15 12ml 2.05 <br /> 3 <br /> 4 <br /> NOTES: A straight drop tube must be tested with a bladder in place and using a flow rate of 80 ml/min. <br /> 'The bladder section of TP-201.11D may he skipped if the entire drop tube passes with a leak rate below 80 ml/min. <br /> 3Leak rate=nitrogen flow rate needed to maintain a constant pressure(at least 2 in.w.c.)for 30 seconds. <br /> I declare, under penalh,of perjtu3,cinder lire laths of the slate of California that based on information and beliefformed after reasonable inquiry, the <br /> statements and information provided in this docunrent are trite, accurate, and complete. <br /> Signature of Technician: Date: 2/7/2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.