My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARCH
>
1206
>
2300 - Underground Storage Tank Program
>
PR0231175
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2019 11:43:33 AM
Creation date
3/29/2019 11:38:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0231175
PE
2361
FACILITY_ID
FA0001247
FACILITY_NAME
ARCO #7147
STREET_NUMBER
1206
Direction
E
STREET_NAME
MARCH
STREET_TYPE
LN
City
STOCKTON
Zip
95210
CURRENT_STATUS
01
SITE_LOCATION
1206 E MARCH LN
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San JoaquinValley <br /> HEALTHY AIR LIVING- <br /> wv;w healthyaulrvin3 coni <br /> AIR POLLUTION CONTROL DISTRICT Make one change for clean air! <br /> TP 201.3 <br /> UST Static Pressure Performance Test Report Form <br /> Permit Number:N-8850 Test Company:Gettler Ryan Inc. <br /> Site Name:Arco 7147 Technician:Alexander Tate <br /> Site Address:1206 E March Lane F Certification Number Expiration Date <br /> City:Stockton Zip:945210 District: SJV-0273 6/30/2019 <br /> Date/Time of Test:2t7/2019 8am <br /> TEST INFORMATION <br /> Total number of nozzles:10 1 Are the tanks manifolded? ❑■ Yes ❑ No <br /> Phase I vapor recovery system executive order(as referenced on Permit to Operate) OPW <br /> Phase II vapor recovery system executive order(as referenced on Permit to Operate) <br /> Nitrogen introduction point p Phase I vapor coupler I ❑ Phase II vapor riser <br /> Pressure measuring device ❑ incline manometer ❑p digital manometer ❑ mechanical gauge <br /> Calibration date for pressure measuring device(must be within 90 days of the test) 1/15/2019 <br /> Ending value for digital manometer drift test if applicable(must be 0.01 in. w.c.or less) 0.0 <br /> Initial tank ullage pressure(vent if over 0.5 in. w.c.) 0 <br /> Nitrogen introduction flow rate,F(must be between 1 and 5 CFM) 1.0 <br /> Calculated ullage fill-time,t,(t,-V/ 1522 x F) <br /> Actual fill-time <br /> 8:39 <br /> Number of hoses with over 100 ml (balance hoses must be drained prior to testing) 0 <br /> TANK INFORMATION <br /> Tank No. I 2 3 4 ALL <br /> Product grade 87 91 <br /> Actual tank capacity(gallons) 10k 10k <br /> Gasoline volume(gallons) 897 5840 <br /> Ullage,V(gallons) 8919 1 3976 12895 <br /> If tanks are not manifolded,number of nozzles <br /> 2 IN. W.C. STATIC PRESSURE TEST <br /> Test No. 1 2 3 4 5 <br /> Start time 11:45 <br /> Initial Pressure, inches of water column(in. w.c.) 200 <br /> Pressure at one minute, in.w.c. 201 <br /> Pressure at two minutes, in. w.c. 1.99 <br /> Pressure at three minutes,in. w.c. 1.98 <br /> Pressure at four minutes, in, w.c. 1.98 <br /> Pressure at five minutes, in. w.c. 1.97 <br /> Allowable minimum pressure, in. w.c. 1.90 <br /> Pass 1 Fail (enter"GF" for gross failure) Pass <br /> I declare, under penalty of perjury under the /avvs of the state of California that based on a formation and belief formed <br /> after reasonable inquiry, the statements and information provided In this document are true, accurate, and complete. <br /> Signature of Technician: Date: 2/7/2019 <br />
The URL can be used to link to this page
Your browser does not support the video tag.