Laserfiche WebLink
UNDERGROUND STORAGE TANK <br /> SPILL CONTAINER TESTING REPORT FORM (Page 1 of 1) <br /> Type of Action ❑x Installation Test ❑Repair Test ❑ 12 Month Test <br /> I. FACILITY INFORMATION <br /> CERS ID Date of Spill Container Test <br /> 2!712019 <br /> Business Name(Same as Facility Name or DBA-Doing Business As) <br /> Arco 7147 <br /> Business Site Address City ZIP Code <br /> 1206 E. March Lane Stockton 194901 <br /> II. UNDERGROUND STORAGE TANK SERVICE TECHNICIAN INFORMATION <br /> Name of UST Service Technician Performing the Test(Print as shown on the/CC Certification) Phone# <br /> Alexander Tate (925) 551-7555 <br /> Contractor/Tank Tester license# ICC Certification# ICC Certification Expiration Dale <br /> 220793 8296693 3/4/2019 <br /> Spill Container Testing Training and Certifications(List applicable certifications) <br /> III. SPILL CONTAINER TESTING INFORMATION <br /> Test Method Used ❑Manufacturer Guidelines(Specify)• <br /> ❑Industry Code or Engineering Standard(Specify) <br /> ❑Engineered Method(Specify)' <br /> Attach the testing procedures and all documentation required to determine the results. #of Attached Pages <br /> TANK ID:(By tank number,stored product,etc.) 87 91 DSL <br /> Spill Container Manufacturer OPW Fill OPW Fill OPW Fill <br /> Method of Cathodic Protection [E Non-Metallic 0 Non-Metallic E Non-Metallic ❑Non-Metallic <br /> ❑Isolation ❑ Isolation ❑Isolation ❑Isolation <br /> ❑Other(Specify in V) ❑Other(Specify in V) ❑Other(Specify in V) ❑Other(Specify in V) <br /> Inside Diameter of Spill Container (Inches) 12 12 12 <br /> Depth of Spill Container:(Inches) 14 14 14 <br /> Does the spill container have a 5 gallon capacity? 9 Yes ❑No E]Yes ❑No F1 Yes ❑No ❑Yes ❑No <br /> Method to Keep Spill Container Empty: ❑Drain Valve ❑Drain Valve ❑Drain Valve ❑Drain Valve <br /> ❑x Onsite Pump 21 Onsite Pump El Onsite Pump ❑Onsite Pump <br /> ❑Other(Specify in V) ❑Other(Specify in V) I ❑Other(Specify in V) ❑Other(Specify in V) <br /> IV. SUMMARY OF TESTING RESULTS <br /> Spill Container Test Results ❑x Pass ❑Fail ❑x Pass ❑Fa,17 z Pass ❑Fail ❑Pass ❑Fail <br /> V. COMMENTS <br /> Any items marked"Fail"above must be explained in this section. Any additional comments may also be provided here. <br /> VI. CERTIFICATION BY UST SERVICE TECHNICIAN CONDUCTING THIS TESTING <br /> hereby certify that the spill containers were tested in accordance with California Code of Regulations, Title 23, Division 3, <br /> Chapter 16,Section 2637.1 and all the information contained herein is accurate. <br /> UST Service Technician Signature <br /> If the facility has more components than this form accommodates,additional copies of this page may be attached. <br /> CERS=Caktorm Envronmental Reporting System,ID=ldentifigCon,UST=Underground Slorage Tank,ICC=International Code Council <br />