My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE HISTORY
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
1111
>
3500 - Local Oversight Program
>
PR0544294
>
SITE HISTORY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2019 4:09:41 PM
Creation date
3/29/2019 4:03:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE HISTORY
RECORD_ID
PR0544294
PE
3528
FACILITY_ID
FA0007044
FACILITY_NAME
SAFEWAY MEAT PROCESSING PLANT
STREET_NUMBER
1111
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
16326007
CURRENT_STATUS
02
SITE_LOCATION
1111 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NN7ESTERN GEOLOGIC RESOURCES , INC . , <br /> IVA <br /> J. Munoz/3 Apr 1989 <br />_ 22 September 1988 - Julian Munoz. Safeway 6.5 <br /> WA transmitted the laboratory reports for soil sampling not incTiker1= l% <br /> previous reports. These include soil samples collected on 26 and 27 July <br /> 1988 and soil samples not previously reported or discussed, which include <br /> soil samples TP-8 and TP-10 collected on 14 March 1988 and soil samples <br />.J= TP-23 through TP-27 collected on 31 August and 1. September 1988. The <br /> results are presented .in Table 1 and the locations are presented in Figure <br /> 7. TPH were not detected in samples TP-23 through TP-27, except in TP-26 <br /> at 4 ppm. <br /> In a proposal to the SJLHD dated 22 November 1988, PI requested to <br /> i-0 <br /> backfill a portion of the excavation. Beginning on 12 December 1988, 80% of <br /> the excavation was backfilled, leaving the southern end open for possible <br /> additional work. The facility's fire main was also reconnected. In March <br /> 1989, the storm drain was reconnected. <br /> This summary is presented in order to assemble all information concerning <br /> `- the tank excavation and stockpile sampling in one document for ease of review <br /> and for evaluation of further steps toward closure of the site. We would <br /> ._ <br /> like to discuss, at your earliest convenience, a meeting with regulatory <br /> agencies to establish those additional steps. <br /> We are pleased to provide environmental consulting services to Safeway and <br /> look forward to working with .you on this project. <br /> Sincerely; <br /> Western Geologic Resources, Inc. <br /> At a <br /> Kathleen A. Isaacson <br /> Project Hydrogeologist <br /> nw/KAI <br /> cc: Gordon Boggs _ California Regional Water Qualitiy Control Board <br /> < Central Valley Region <br /> r- <br /> Hardip Ahluwalia - San Joaquin Local Health District <br /> L'r <br /> 07611ma9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.