My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
25651
>
2300 - Underground Storage Tank Program
>
PR0231628
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:55:56 PM
Creation date
3/29/2019 4:07:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0231628
PE
2361
FACILITY_ID
FA0003835
FACILITY_NAME
SMK CHEVRON
STREET_NUMBER
25651
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
APN
00514120
CURRENT_STATUS
01
SITE_LOCATION
25651 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ip <br /> SAN JOAQUIN COUNTY <br /> ENVIRONMENTAL HEALTH DEPARTMENT <br /> 1868 East Hazelton Avenue, Stockton, CA 95205-6232 <br /> Telephone:(209)468-3420 Fax:(209)468-3433 Web:www.sigov.orglehd <br /> UNDERGROUND STORAGE TANK (UST) PROGRAM SERVICE REQUEST INSPECTION REPORT <br /> Facility Name: Inspection Date: <br /> k eve 3,21 -fir <br /> Facility Address: Servicequg est#:q ^( <br /> a sbsl N vJ -Ac tF��^'�C, sy <br /> Onsite Service Technician's Name: ICC Service Technicianllnstal ate: Manufacturer Training: <br /> `1a <br /> SERVICE SERVICE <br /> Leak detector Spill bucket ❑ minimum 5 gallon <br /> El El mechanical Model: El ❑ 1 hour hydrostatic ❑ Incon TS-STS <br /> ❑ electronic Serial#: <br /> ❑ line test programmed ❑ Caldwell System ❑Other <br /> _Leak detector Spill bucket ❑ minimum 5 gallon <br /> ❑ mechanical Model: <br /> El ❑ electronic Serial#: El ❑ 1 hour hydrostatic ❑ Incon TS-STS <br /> ❑ line test ro rammed ❑ Caldwell System ❑ Other <br /> sensor Primary piping testing at: <br /> ❑ ❑ positive shutdown Model: ❑ psi <br /> El fail safe Serial#: p <br /> ❑ NA —minutes <br /> sensor Secondary containment testing for. <br /> ❑ ❑ positive shutdown Model: UDC(s) Piping <br /> ❑fall safe Serial#: Sump(s) UST(s) <br /> ❑ NA <br /> sensor ❑ Testing for the above components are next due by: <br /> ❑ ❑ positive shutdown Model: <br /> ❑fail safe Serial#: Note: Please be aware that 2°containment components one required to be tested upon <br /> ❑ NA installation,6 months a/ler,and every 36 months thereafter. <br /> ❑ Drop tube with mechanical overfill at 95% ❑ Cold start of monitoring panel <br /> ❑ Drop tube with mechanical overfill at 95% ❑ Corrosion protection <br /> ❑ Overfill prevention(see LG letter 150-1) Other: see below <br /> ❑ This UST facility is APPROVED to operate ❑ This UST facility is NOT APPROVED to operate <br /> 0 IgizA hycA-�/o <br /> A ee Mewk )ai <br /> 1 <br /> A ( ` r <br /> THIS FACILITY ISSUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br /> e,aEHD Inspector: Ivetl B /, N <br /> Q <br /> Title0f&C7 ArJ/9T12 <br /> EHD 23-114 UST SERVICE REQUEST INSPECTION REPORT <br /> Rev 4/30/12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.