My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012602
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
1111
>
3500 - Local Oversight Program
>
PR0544294
>
ARCHIVED REPORTS XR0012602
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2019 4:30:38 PM
Creation date
3/29/2019 4:09:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012602
RECORD_ID
PR0544294
PE
3528
FACILITY_ID
FA0007044
FACILITY_NAME
SAFEWAY MEAT PROCESSING PLANT
STREET_NUMBER
1111
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
16326007
CURRENT_STATUS
02
SITE_LOCATION
1111 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
371
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. y <br /> y <br /> P' <br /> wri.Ss ASSOCIATES K4 <br /> Julian Munoz 7 <br /> February 10, 1968 <br /> ediate turnaround <br /> Stockton, California by GC/FID for TFHC on an imm <br /> basis AS the excavation advances. <br /> 3} Stockpile the excavated soil with the pea gravel on the liner. <br /> 4) Once the sampling indicates that all soil) containingngde ecta t <br /> g it <br /> hydrocarbons 1s removed' and <br /> close the excavationY <br /> and cap it with an impermeable �ove <br /> clean sand or pea gravel r <br /> 11ve1 <br /> t , tilreduce hydrocarbon concenttheiorainytleseason, asdisobeingddone`with` the <br /> will be aerated after <br /> other stockpiled material previous'y removed from the excavation. <br /> . w <br /> SCOPE OF WORK <br /> WA's scope of work for the excavation and sampling is detailed below. <br /> of <br /> Task i - Guide the removal of additional soil and determine excavations and <br /> les during <br /> excavation by collecting soil samp <br /> analy4ing the samples by GC/FID for TFHC; <br /> 1 Task 2 - Prepare a final report. <br /> An Extra Scope of Work (ESOW) budget for these tasks will be forwarded to <br /> you under separate cover. The budget assumes that the noammore an 15sampling <br /> GC/FID <br /> Y personnel time and thatat <br /> will require only 1 day of WA p <br /> analyses will be needed to determine tel dayLcoststs fforexcavation. <br /> additional day <br /> excavation and sampling takes longer thanY <br /> will be presented in the budget as option A. <br /> PI will perform all earth-moving under separate contract to Safeway <br /> stores. <br />
The URL can be used to link to this page
Your browser does not support the video tag.