Laserfiche WebLink
r d <br /> }' <br /> RIMM <br /> VfISS u TE$ K4 <br /> Julian Munoz 10 <br /> 15 October 1987 <br /> Monitorin Well Installation <br /> hey were <br /> y A <br /> Well locations are shown on Figure 2. Twere constructednwibh 4Win.aID <br /> approved by the SJLIiD. The monitoring wellsprotected <br /> Schedule 40 factory-threaded PVC screen afficoratedcasing, <br /> manholesandwwere wells were sealed <br /> by locking well caps and at-grade tr <br /> from surface infiltration with a 1-1/2 ft thick bentonite plug and cement/sand <br /> grout. <br /> Monitoring well MW-1 is located approximately 12 ft east o€ the tank pit <br /> ound surface. Monitoring <br /> excavation and is screened from 25 to 34 £t below gr <br /> well MW-2 is approx •jately 15 ft north of the tank pit and is screened from 23 <br /> to 33 ft. well MW-3, screened from 25 to 35 ft, is located approximately 19 <br /> ft southwest of the excavation. <br /> Monitoring <br /> wells were screened to monitor ground water in the <br /> water-bearing zone found between 24 and 33 ft below ground surface. No <br /> water-bearing materials were found obent <br /> s24 <br /> ignificant laterally extensive migrationrd <br /> ial <br /> ft, To avoid creating a conduit €or the downwa <br /> wereonotpextended <br /> hydrocarbons from soils near the water table, well screens <br /> to the unsaturated zone. <br /> Well Develo ment <br /> Wells MW-I, MW-2 and MW-3 were developed and sampled on 25 August 1967. <br /> Wells MW-1 and Mu-2 p <br /> were developed using a combination of pumping with a <br /> submersible pump, surge blocking and bailing. MW-3 was developed with a <br /> submersible pump and surge blocking. The submersible pump was fitted with a <br /> the <br /> check valve to prevent backflushing of agitated <br /> water <br /> was steam-cleaned well <br /> use <br /> pump was turned off. The development equipment <br /> tilled <br /> and was thoroughly rinsed with tap water umes ofsdevelopmentPwatertween wells. <br /> were removed <br /> Approximately 150 gallons {ln well volumes) <br /> ----------- --------- <br /> MW-2 and 460 <br /> from-Kw--1,-260_gallons (25 well volumes) were reomved from <br /> gallons (47 well volumes) were removed from MW-3. <br />