My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0012602
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
1111
>
3500 - Local Oversight Program
>
PR0544294
>
ARCHIVED REPORTS XR0012602
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2019 4:30:38 PM
Creation date
3/29/2019 4:09:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0012602
RECORD_ID
PR0544294
PE
3528
FACILITY_ID
FA0007044
FACILITY_NAME
SAFEWAY MEAT PROCESSING PLANT
STREET_NUMBER
1111
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
16326007
CURRENT_STATUS
02
SITE_LOCATION
1111 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
371
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r iV r <br /> r. <br /> Ki wF <br /> , G - <br /> 3t <br /> 3F- _ <br /> 6 <br /> Consulting in Geology E Gechydrology <br /> y�IEfSS ASSOCIATES 415.465.1100 <br /> 2938 McClure Street. Oakland, CA 94609 <br /> r <br /> IO June 1987 <br /> Julian Munoz, Plant Engineer <br /> Safeway Stores, Inc. , <br /> 1111 Navy Drive <br /> Stockton, CA 9502+ ' <br /> Re: Subsurface Investigation <br /> Stockton, California <br /> wA Job No. 44-245-01 <br /> Dear Mr. Munoz: <br /> This interim report presents the results of the subsurface investigation <br /> 1111 Na DriveStockton, California, Phase 1, Task <br /> at Safeway Meat Packing, �7' , permits have <br /> II: Soil Boring. Sampling and Analysis. Delays in obtaining <br /> Tank Excavation. Nick Bokides of <br /> prevented us from completing Task I permits have been approved and that <br /> Precision Industries indicates that the P ort presenting the results <br /> tank removal may begin around 17 June. A letter rep <br /> r of Task I will be prepared after task completion. <br /> The scope of work for Task 11 included: <br /> o Drilling two soil borings on each side of the tank cluster for a total <br /> of eight borings (Figure 1); <br /> o Collecting soil samples every five feet in <br /> the boreholes to describe <br /> the <br /> il <br /> subsurface hydrogeologic conditions <br /> VB r dAnalyzere (OVA) to samples <br /> to deermine <br /> the field with a portable Organic P (VOCs) in <br /> the presence or absence of volatile organic compounds <br /> unsaturated and saturated soil; <br /> A Dicicrrn,of Agt4ffwrr,,Agcpera Sec hinrir••r red . <br />
The URL can be used to link to this page
Your browser does not support the video tag.