Laserfiche WebLink
I <br /> t <br /> FRGE01, G [ cIZt:srtt. ttt: r. 5 , t � {: , <br /> STANDARD OPERATING PRO"EDURES <br /> _ RE:HOLLOW-STEN1 AUGER MONITOR WELL INSTALLATION AND DEVELOPdILNTT <br /> 5OP-3 <br /> The boreholes for monitor wells are drilled using a truck-mounted hallow-stem auger drill rig. <br /> s The diameter of the borehole will be a minimum of four inches larger than the outside diameter(OD} <br /> of the casing when installing well screen. The hollow-stem auger provides minimal interruption of <br /> drilling while permitting soil sampling at desircd intervals, Soil samples are collected by hammering a <br /> conventional split-barrel sampler containing pre-cleaned 2-inch brass sample tubes. A geologist from <br /> - _ Western Geologic Resources continuously logs each borehole during drilling and constantly checks drill <br /> A cuttings for odors. The sampler is rinsed between samples and steam-cleaned with all other drilling <br /> equipment between borings to prevent cross-contamination. <br /> Monitor wells are cased with threaded,factory-perforated and blank Schedule 40 PVC. The <br /> perforated interval consists of slotted casing,generally 0.020-inch wide by 1S-inch long slot sire,with <br /> 42 slots per foot, A PVC cap is fastened to the bottom of the casing with:.rainless steel screws;no <br /> solvents or cements are used. Centering devices may be fastened to the casing to assure even <br /> distribution of filter material and grout within the borehole annulus. The well casing is thoroughly <br /> Lam. washed and steam-cleaned prior to installation. <br /> After setting the casing inside the hollow stem,sand or gravel filter material is poured into the <br /> annular space to fill from the bottom of the boring to 1 foot :hove the perforated interval. A 1-to 2- <br /> foot thick bentonite plug is placed above this filter material to prevent grout from infiltrating down into <br /> the filter material. Neat cement,containing about 5%a bentonite,is then tremied into the annular space <br /> v from the top of the bentonite plug to the surface. A lockable PVC cap is placed on each wellhead. <br /> Traffic-rated Chr.--sty boxes are installed around the wellhead for weUs in parking lots and driveways <br /> while steel stove pipes arc usually set over%,ellheads in landscaped areas. <br /> After installation,the wells are thoroughly developed to remove residual drilling materials from <br /> the wellbore,and to improve well performance by removing any fine material in the filter pack that can <br /> pass from the formation into the well. Well development techniques used include pumping,bailing, <br /> surging,swabbing,jetting,flushing,and airlifting. All development water is collected in 55-gallon drums <br /> for temporary storage,and is then disposed of properly depending on analytic results. To assure that <br /> velopment, all development <br /> cross-contamination does not occur between wells during drilling and de <br /> equipment is steam-cleaned. <br /> w _ <br /> WIN <br /> IIIJIl <br /> MEMO 1,F5115111 <br /> rrasn�wwmian�ws i1st <br />