Laserfiche WebLink
r , n G () GIC R1 SOURCI S , Inc: . <br /> J Munoz/3 Apr 1989 5 <br /> 22 September 1988 - Jul ian_Hurlozs_ 5afewav <br /> WA transmitted the laboratory reports for soil sampling not included in <br /> previous reports These include soil samples collected on 25 and 27 July <br /> 1988 and soil samples not previously reported or discussed, which include <br /> soil samples TP-8 and TP-10 collected on 14 March 1988 and soil samples <br />' TP-23 through TP-27 collected on 31 August and 1 September 1988 The <br /> results are presented in Table I and the locations are presented in Figure <br /> 7 TPH were not detected in samples TP-23 through TP-27, except in TP-26 <br /> at 4 ppm <br /> 1 <br /> In a proposal to the SJLHD dated 22 November 1988, PI requested to <br /> backfill a portion of the excavation Beginning on 12 December 1988, 8090 of <br /> the excavation was backfilled, leaving the southern end open for possible <br /> additional work The facility's fire main was also reconnected In March <br />' 1989, the storm drain was reconnected <br /> This summary is presented in order to assemble all information concerning <br /> the tank excavation and stockpile sampling in one document for ease of review <br /> and for evaluation of further steps toward closure of the site We would <br /> like to discuss, at your earliest convenience, a meeting with regulatory <br /> agencies to establish those additional steps <br /> We are pleased to provide environmental consulting services to Safeway and <br /> look forward to working with you on this project <br />' Sincerely, <br /> Western Geologic Resources, Inc <br /> 16WL�1 c:,Gr Cc <br /> Kathleen A Isaacson <br /> Project Hydrogeologist <br /> nw/KAI <br /> cc Gordon Boggs - California Regional Water Qualitly Control Board <br /> Central Valley Region <br /> Hardip Ahluwalza - San Joaquin Local Health D)str}ct <br /> 07611ma9 <br />