My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
NAVY
>
1111
>
2900 - Site Mitigation Program
>
PR0538728
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2020 2:31:25 PM
Creation date
4/1/2019 10:01:26 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0538728
PE
2950
FACILITY_ID
FA0022234
FACILITY_NAME
ZACKY & SONS POULTRY LLC
STREET_NUMBER
1111
STREET_NAME
NAVY
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
16326007
CURRENT_STATUS
01
SITE_LOCATION
1111 NAVY DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
99/14/1995 04: 52 9093579307 T, flTn n4GE 10 <br /> • • SOP NO. 103 <br /> REVISION NO.0 <br /> DATE: 0116M <br /> tPAGE 9 OF 11 <br /> 4.5.6 If collecting Samples for analysis of volatile organic compounds (VOCs), fust <br /> inverted to ensure no <br /> completely fill the VOC sample vials. Foch filled. capped vial will be opened and refilled with <br /> ' air bubbles are present. If an air bubble is present, the vial will be <br /> an additional sample. The vial will be immediately capped and chtscioed again for bubbles. If <br /> air bubbles ars Still present, the VOC sample vial will be discarded and a new vial used The <br /> ' <br /> VOC sample vial filling procedure Is thea repealed until noair bubbles an present. <br /> 4.5.7 If other sample analyses are required. fill the other sample containers after the VOC <br /> sample vials ate ftllod. Samples collected for metals and general minerals analysis will be <br /> ' filled to the base of the bottle neck Case will be taken not to aerate the sample during <br /> transfer from the bailer to the sample bottles and not to overfill bottles contLmmg <br /> preservatives. All amply shall be appropriately preserved per SOP 9.1 and the Project work <br /> ' plass:. <br /> ' 4.5.8 Each sample container to be submitted for analysis will be appropriately labeled. The <br /> label will be filled out using waterproof ink and writ contain, at a minimum, the following <br /> information: <br /> • dam and time sample was collected <br /> • ample location sampling <br /> • the initials of the individual conducting the <br /> • any additional required information. <br /> ' 4.5.9 Document the sampling event on the Sample Collection Log (Attachment 6.2) or an <br /> ' equivalent farm as specified in the project work plans. <br /> 4.5.10 Place the labeled vials in seam-sealing Plastic bags (i.e.. rzplock). Seal the bag, <br /> ' removing any Mms air, and tape the bag with custody tape so that removal of the sample <br /> will cause the tape to be broken. <br /> 4.5.11 Conduct a visual inspection of the turbidity of samples and record on the FADL <br /> ' (Attachment 6.1) and on the Sample Collection Log (Attachment 6.2) to provide a qualitative <br /> record of results. <br /> ' MZM3.I645IO0Y /SOPMM0.2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.