Laserfiche WebLink
a AR <br /> U. iFIED PROGRAM CONSOLIDATED FORS. <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN - (Page 2 of 2) <br /> VI. UNDER DISPENSER CONTAINMENT C MONITORING (Checkall <br /> that anply)l <br /> UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) <br /> 10 1.CONTINUOUS ELECTRONIC MONITORING ❑ 2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE 490-54a. <br /> ❑ 4.NO DISPENSERS ❑ 99.OTHER(Specify) 490-54b. <br /> LEAK MONITOR MANUFACTURER: Y�e a de r go Dr MODEL MODEL#: 'rL.S '5!545 <br /> aso se. <br /> LEAK SENSOR MANUFACTURER: 8007- 490-17. MODEL#(S): `7g1!:13 to- `dog, 410-11- <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. a.YES ❑ b.NO 490-59. <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN. a.YES ❑ b.NO 4900• <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. [4 a.YES ❑ b.NO 410-61- <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. O a.YES 2 b.NO 490-62. <br /> __...._......_.__.__..................... <br /> .... <br /> UDC CONSTRUCTION IS: 1.SINGLE WALL ❑ 2.DOUBLE WALL 490-63. <br /> IF DOUBLE WALL: 490.64a. <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: ❑ a.LIQUID ❑ b.PRESSURE ❑ c.VACUUM <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ❑ a.YES ❑ b.NO 490-64b. <br /> VII. PERIODIC SYSTEM TESTING <br /> ❑ L ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490-65- <br /> LEAK DETECT[ NELD MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED.123 CCR 12644.q <br /> ® 2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 490-66. <br /> ® 3.SPILL BUCKETS ARE TESTED ANNUALLY. 490-67. <br /> VIII. RECORD KEEPING <br /> The following monitoring/maintenance records are kept for this facility: 490.69. <br /> E a.ALARM LOGS ❑ b.VISUAL INSPECTION RECORDS ❑ c.TANK INTEGRITY TESTING RESULTS <br /> ❑ d.SIR TESTING RESULTS(and supporting documentation records) ❑ e.TANK GAUGING RESULTS(and supporting documentation records) <br /> ❑ f.ATG TESTING RESULTS(and supporting documentation records) ❑ g.CORROSION PROTECTION 60-DAY LOGS <br /> ® h.EQUIPMENT MAINTENANCE AND CALIBRATION RECORDS <br /> IX. TRAINING <br /> Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties: 490.69a. <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> ® THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) 490-69b. <br /> ® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) 490-69c• <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490.69d. <br /> [I CALIFORNIA UNDERGROUND STORAGE TANK LAW 490.69e. <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND 490.691: <br /> STATISTICAL INVENTORY RECONCILIATION" <br /> E] SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" 490-69g. <br /> ❑ 490-69h. <br /> OTHER(Specify): <br /> 490-696. <br /> This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council 490-70. <br /> (ICC). The "Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 <br /> days of hire.This training will include,but is not limited to,the following: <br /> Y Operation of the UST systems in a manner consistent with the facility's best management practices. <br /> ➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan. <br /> ➢ The facility employee's role with regard to spills and overfills as specified in the facility's UST Response Plan. <br /> Y Name(s)of contact person(s)for emergencies and monitoring alarms. <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how man pages with additional information on specific monitoring procedures are attached to this plan. 490-7:. <br /> tal cry � ,-+a✓e.,er�o� a� jrJs <br /> XI. PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that: 1.)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered <br /> . are investigated,and 3_)all monitoring records are maintained., ro erl: .. <br /> by this plan occurs;2 J all conditions that indicate a possible.release.....- ......... __ g0-_ P...._ .......Y.._.- <br /> THE FOLLOWING ERSON(S)ARE RESPONSIBLE FOR PERFORMING THE MONITORING AND EQUIPMENT MAINTENANCE: <br /> NAME: 40ACk i�1 490-72. TITLE:�� V;T W 490-73. <br /> NAME: • ` 490-74. TITLE: 490-75. <br /> UAAA <br /> The Designated UST Operator shall perform a monthly visual inspection of the facility,provi e a report to the owner/operator,and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> XII. OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:I certify that the Information provided herein is true and accurate to the best of my knowledge. <br /> APPLICAINy/�TI�lG/'�NATU(/R%�,�E.6 DATE: 490-77• <br /> RE �NfING:U l �Ownerl ator 2.Facit' Owns/ for[13.Amharizcd R esentative ofOwoc 490-76. � <br /> APPLICANT NAME(print): 490.79. APPLICAN TITLE:, 490-79. <br /> UPCF UST-D(12/2007)-3/4 www.tinidoes.org <br />