Laserfiche WebLink
RCCt IVCC <br /> t r - <br /> FOX ENVIRONME .NTA SERVICES, INC. <br /> { <br /> 8015 West Cliff Drive • Knoxville, TN 37909 (615) 690-1996 <br /> i <br /> j <br /> February 11 , 1987 <br /> Mr. James C. Thompson <br /> Kayo. 0il Company' <br /> 900 South Cherokee Lane <br /> Lodi , CA 95240 <br /> i <br /> RE: Fast Gas Station <br /> 800 East Highway 12 <br /> Lodi , CA <br /> I <br /> Dear Mr. Thompson : <br /> The following is a report of the environmental activities conducted by <br /> Fox Environmental Services , Inc. for the period of December 3, 1986 to <br /> January 30, 1987 at the Fast Gas Station located at 800 East Highway 12 <br /> in Lodi , CA. <br /> No groundwater measurements were conducted by Fox Environmental Services <br /> during the month of December, ' but it should be noted that the system was <br /> turned off between January 4, 1 <br /> 1987 and January 17, 1987 due to rain fall <br /> causing the holding pond to fill with surface runoff. The system was re- <br /> started on. January 17, 1987 and has been in operation since that time. <br /> .i <br /> Groundwater monitoring was conducted on January 30, 1987, and those re- <br /> sults are attached. Groundwater at this location is continuing to rise, <br /> and during this reporting period , has risen an average of 1 .76 feet. <br /> During the monitoring of the groundwater levels , no phased hydrocarbons <br /> were observed or detected. ? <br /> On January 17, 1987, a spherical shaped PVC type packing was added to the <br /> air stripping tower at the midpoint We are awaiting the new round of <br /> analytical results to assess the effectiveness of this packing. <br /> For the period of December 3,' 1986 to January 30, 1987, 112,420 cubic feet <br /> (843, 150) gallons of water has been processed through the system. The <br /> new meter reading for January'.k30, 1987 is 166, 190. <br /> During -the week of February 9., 1987 the spray tower and water feed tank <br /> will be pawi.nted, as the paint', has peeled badly on these two items . Routine <br /> groundwater 'monitoring will again be conducted during the month of February <br /> 1987. Please advise of any additional req irements you mayhavefor this site. <br /> v truly our <br /> ames R. ox i <br /> Project Manager <br /> JRF/wl <br /> Attachments <br />� a <br />