Laserfiche WebLink
MO ,ORING WELL INSTALLATION Ci_ 7RT <br /> . Fast Gas, Lodi, Cal forrua WELL, 1No. : 16 <br /> PROJECT- Fox Envizormtental KAYO Oil C LOCATION: E. of tacilityIn grape <br /> PROJECT No.TL 385-124-01 INSTALLED BY: D. Diebert vineyard. <br /> DATE -9r-23-85 <br /> METHOD OF INSTALLATION: The boring was made using 8-inch holow augers. The pipe was <br /> lowered through the hollow auger and ETZ auger r e depm ot seas FiB <br /> of pipe installed is shown on the sketch below. <br /> i <br /> MONITORING WELL INSTALLATION DATA <br /> TYPE OF WELL: GROUND ELEV. -"" TOP OF RISER ELEV. : "--- ' <br /> Type of Cap: ,Sealed <br /> L-1 <br /> I I .D. of Riser Pipe: 2.067-inch ; <br /> } j Type of Pipe Schedule 40 PVC <br /> L2 {) <br /> Ll = 0'-3" L$ I Type of Backfill Around Riser <br /> { I Bentonite Cement Slurry <br /> L2 = 15'-6" f <br /> Top of Seal Elev. : 151-611 i <br /> L3 = 2'-0" Type of Seal Material : 1/4-inch <br /> Bentonite Pellets <br /> L4 = 53'- 6„ L7 <br /> L5 = 20'-81, L3 <br /> L6 = 50'-4" <br /> L - 73'_0„ Top of Filter Elev. . i <br /> 7 Type of Filter Material <br /> 111 : _ 5/16-inch Pea Gravel <br /> l Size of Openings 0.020-inch 1 <br /> L4 I: <br /> L6 1`11' Diameter of Tip: 2.375-inch <br /> 1 • <br /> 1 <br /> j11 •;I . <br /> 711 i <br /> I 111 <br /> Bottom of Well Elevation: 70'-8 <br /> Bottom of Boring Elevation: 73'-0" <br /> Diameter of Boring: 8-inch I <br /> I <br /> REMARKS: <br /> a1wc;7 ititnytaO urtbu, <br /> Fresno ModestoVisalia Bakerstield. <br /> s;r y: <br /> a <br />