Laserfiche WebLink
M TOR I NG WELL INSTALLATION O. T <br /> Fast Gas, Lodi, California WELL No1._ - 18 <br /> PROJECT FOX Environmental - KAYO Oil Company LOCATFON: H;i� i, a 1 <br /> PROJECT Nom 385-124-01 INSTALLED BY: G. Kiger DAM/TINE: 9-25-85/11 a.m. <br /> METHOD OF INSTALLATION: The boring was made us' 8-inch augers. The: pipe was <br /> lowered through the hollow auger and the auger raised. The depth of seals and of <br /> pipe installed is sham on the sketch below. <br /> I <br /> MONITORING WELL INSTALLATION DATA. <br /> - i <br /> TYPE OF WELL: Groundwater Monitorinc7 GROUND ELEV. : :TOP OF RISER ELEV. : �- <br /> --Type of Capz Sealed/ Z)Cked <br /> Ll <br /> I .D. of Riser Pipe: 2-inch <br /> I I Type of Pipe Schedule 40 PVC <br /> L2 <br /> Ll Y 01-311 L5 Type of Backfill Around Riser <br /> 20% Bentonite, Bo% Gement <br /> LZ - 15'-611 ._. - I - - .. <br /> Top of Seal Elev. . 151-6" <br /> Lj - 11-0" <br /> Type of Seal Material : <br /> L4 = 541._01 1/4-inch Bentonite. Pellets <br /> L7 <br /> L5 - 20'-S" L3 <br /> - T i <br /> L6 = 50'-0" Y <br /> L7 � 74'-6" <br /> Top of Filter Elev. . 16'-6" <br /> I L7 Type of 'Fi Mer Material . <br /> f+•, �;; :.t 5/16" Pea Gravel I <br /> I: aSize of Openings: 0.020-inch <br /> LA <br /> L6 ; Di ameter. bf Tip: 2-inch i <br /> Bottcm of-well Elevation: 70'-8" <br /> 7. <br /> Bottom of Boring Elevation: 74'-6" <br /> Diameter. of Boring : 8-inch <br /> i <br /> REMARKS: <br /> . �hCQ71LY1L(1LQ�f101QIOl1CJ.�IiL. <br /> Fresno Modesto. Visalia 8akersheld <br />