My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
2448
>
3500 - Local Oversight Program
>
PR0544300
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2019 4:12:50 PM
Creation date
4/2/2019 3:23:03 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0544300
PE
3528
FACILITY_ID
FA0003855
FACILITY_NAME
TESORO (SHELL) 68153
STREET_NUMBER
2448
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
05814001
CURRENT_STATUS
02
SITE_LOCATION
2448 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
494
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
dpf <br /> Mr' J K, Willi amson 14 August 1985 <br /> and 25299.5 states. <br /> "Phis chapter shall not be construe to limit or. abridge the <br /> Powers and duties granted to = the`. tate Department of Health <br /> Services: by Chapter 6.5 (commencin with Section 25100) and _ <br /> Chapter 6.8 {commencing with Section 25300) or to the State <br /> Water Resources Control,. Board and. each regional . water quality <br /> control board by Division 7 (commencing with Section 13000) of - <br /> the Water Code." <br /> California Water„Code Section 13267 states in art <br /> "(a) A regional board, in establishing or eviewing any water quality <br /> control plan or waste discharge req irements, 'or in connection <br /> with any. action relating thereto or uthorized by this division, <br /> may investigate . the dual ity of any he state within <br /> aters . of t <br /> its region. <br /> (b) . In such an investigation, the regional board may require that <br /> ' Any person discharging or proposing to discharge waste within <br /> - its.:region or any citizen .or domiciliary, or political agency or <br /> -entity of .this state discharging or roposing to discharge waste;. <br /> outside of its region that could' affect the equality of waters <br /> wi.thin. .its region shall furnish, under penalty of perjury, .such <br /> technical or monitoring. 'program reports. as the board may. spec <br /> ify;`provided. that the burden, including -costs, of: such reports' <br /> shall..bear..:a reasonable relationship to .the need 'for. the report. <br /> and the benef i is. to be of ai ned there rom:". <br /> y <br /> Pursuant f6 ` our . authority. under the :.urate .. Code :and Health and Safety Code we <br /> 'request .that_-you per the following: r ; <br /> ° 1,' .: Monitor all ,on-site wells daily at ah1: service stations owned or- operated by: <br /> Kayo where gasoline has been -determined to have been;-released and -remove <br /> accumulated product found. <br /> 2. Obtain water samples from all ground water monitoring wells '.on Kayo's sites <br /> and have them analyzed. ,Samples are to be taken before 30 August 1985 and <br /> results reported to the Regional Board and Local Agencies no" later than 20 <br /> days after the samples. are taken. lknalyses shall include: - Total hydro- <br /> carbons, Benzene, Toluene, and Xylene. <br /> 3. Submit work plans to the Regional Bo rd and Local Agencies for review ana <br /> approval . The 'work plans shall inclu e: - installation of. additional ground <br /> water monitoring wells to supplement the three currently at each site; and <br /> service station inventory. records for asoline and diesel fuels . T"^ ^roposed <br /> wells must be sufficient to characte i'ze the areal and vertical. extent of <br /> ground water and soil contamination .( ff-site wells may be required) and may <br /> require phased drilling . The work )lan, due by: 2 September 1985, is to <br /> include a gime schedule for phasing a' nd completing the work. <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.