Laserfiche WebLink
ESTINIATION OF PETROLEUM HYDROCARBONS <br /> 1 EXISTING IN SOIL AFTER REMEDIATION <br /> Beacon Station No.696 <br /> ' 2448 West Kettleman Lane <br /> Lodi,California <br /> ' 1. Estimation of benzene existing in soil after remediation. <br /> (A) Layer A(15-25 feet) Note C=concentration <br /> 1 I. Pounds of benzene(Volume 1) <br /> 1 CAI :=0.5-mg Analytical results below the limit of detection. Assume 0.5 mg/kg. <br /> kg <br /> 1 C Al =0.5-mg <br /> kg <br /> 1Al a•{2S• )•(20-ft)•(1Q•ft)•(110.1� • C <br /> A <br /> l <br /> 3 <br /> ft 1.106 mg <br /> kg <br /> A 1 =0.9-Ib <br /> Total Pounds of benzene(Layer A) <br /> i A =A1 <br /> A=0.9•lb <br /> 1 <br />