My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0004139
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KETTLEMAN
>
2448
>
3500 - Local Oversight Program
>
PR0544300
>
ARCHIVED REPORTS XR0004139
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2019 3:58:08 PM
Creation date
4/2/2019 3:51:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0004139
RECORD_ID
PR0544300
PE
3528
FACILITY_ID
FA0003855
FACILITY_NAME
TESORO (SHELL) 68153
STREET_NUMBER
2448
Direction
W
STREET_NAME
KETTLEMAN
STREET_TYPE
LN
City
LODI
Zip
95240
APN
05814001
CURRENT_STATUS
02
SITE_LOCATION
2448 W KETTLEMAN LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ultramar <br /> Ultramar Inc Telecopy 209 584 6113 Credit&Wholesale <br /> P O Box 466 209 583 3330 Administrative <br /> 525 W Third Street 209 583 3302 Information Services <br /> Hanford CA 93232 0466 209 583 3358 Accounting <br /> (209)582-0241 <br /> ENVIRONMENTAL PROJECT <br /> QUARTERLY STATUS REPORT <br /> N1 Y <br /> DATE REPORT SUBMITTED: April 14, 1993 APR 19 1993 <br /> QUARTER ENDING: March 31, 1993 ,s`�e�1— ) <br /> � MCENTAL HEALTH <br /> SERVICE STATION NO. : 696 FL-MVI IT/SERV!CES <br /> ADDRESS: 2448 West Kettleman Lane, Lodi , California <br /> COUNTY: San Joaquin <br /> ULTRAMAR CONTACT: Kenneth R. Earnest TEL. NO: 209-583-5571 <br /> BACKGROUND: <br /> Ultramar purchased site from Conoco in July 1990. Several <br /> ground-water monitoring wells had been installed by Conoco <br /> (formerly Kayo Oil Company) at and near the site. At the time <br /> of site purchase, all but one well (MW-20) was dry. A vapor <br /> extraction system was operated at the site until the end of <br /> December 1990 The thermox unit was then removed and <br /> permitting for a catalytic unit was initiated. <br /> In February 1991, three additional ground-water monitoring <br /> wells (MW-34, MW-35, and MW-36) were installed along the <br /> south, east, and west boundaries of the site in an effort to <br /> evaluate both ground-water gradient and water quality. Soil <br /> and ground-water analyses showed nondetectable to low TPHg and <br /> benzene concentrations. <br /> A permit application for a catalytic incinerator was submitted <br /> to the APCD for processing and the unit began operation on <br /> August 23, 1991. <br /> The catalytic unit was removed and granular activated carbon <br /> was installed on September 9, 1992. <br /> SUMMARY OF THIS QUARTER'S ACTIVITIES: <br /> Groundwater Monitoring was performed February 5, 1993. <br /> A Member of the Ultramar Group of Companies #t Quality and Service <br /> UftrBmar <br />
The URL can be used to link to this page
Your browser does not support the video tag.