Laserfiche WebLink
CaliforniaDegional Water Quality Cool Board ; <br /> Central Valley Region <br /> Karl E.Longley,SeD,P.E.,Chair ' <br /> Linda S.Adams Arnold <br /> Eec11020 Sun Center Drive#200,Rancho Cordova,California 95670-6114 <br /> Samna for Phone(916)464-3291 •FAX(916)464464 p (�ppp Schwarzenegger <br /> Environmental REC HWED Governor <br /> Protection http://www.wa[erboards.ca.gov/cenvalvalle v <br /> Ms. Eugenia Valdez SEP 1 0 26%�eptember 2009 <br /> J&LMarket <br /> 812 ENNONMEN T HEALTH8125 EI Dorado Street PERP,�IT/SERVICES <br /> French Camp, CA 95231 <br /> DOCUMENT REVIEW, J&L MARKET, 8125 S. EL DORADO ST., FRENCH CAMP, <br /> SAN JOAQUIN COUNTY, CASE NO. 390897 <br /> I reviewed the Pilot Testing Work Plan (Workplan), received 1 July 2009 from your consultant ATC <br /> Associates, Inc. The Workplan proposes installation of two ozone sparge wells spaced 20' apart and <br /> with screens at 35' below ground surface for a pilot test lasting 4 weeks, using a mobile ozone <br /> generator. Each ozone well will alternate between receiving active ozone injection at 2 to 3 cubic feet <br /> per minute.for a duration of 15 to 20 minutes per hour, with observation monitoring for water levels, <br /> dissolved oxygen, oxidation-reduction potential, pH, temperature, and analyses of ozone injection <br /> byproducts (total chromium, hexavalent chromium, and bromate). Nearby shallow monitoring wells <br /> (JLM-3 and JLM-13) will also be sampled for petroleum hydrocarbons, including fuel oxygenates and <br /> lead scavengers, from two to three times per week during pilot testing. A pilot study report will be <br /> submitted 6 weeks after completion of field work. <br /> The Workplan is approved with the following conditions: <br /> • Each ozone well will be injected for a minimum of three days before switching to observation <br /> mode, <br /> • Sampling of wells JLM-3 and JLM-13 is to only be once a week during pilot testing, not two to <br /> three times per week as proposed, <br /> • Sampling for petroleum hydrocarbons, total chromium, hexavalent chromium, and bromate will <br /> occur prior to startup of testing, immediately following completion of all testing, and once per <br /> week during the pilot study, <br /> • Sampling for the remaining field meter parameters will occur prior to startup of testing, <br /> immediately following completion of all testing, and before and after each ozone well is used for <br /> ozone injection during testing (once every three days), and <br /> • A schedule with dates for the ozone pilot study is due 30 September 2009. <br /> Semi-annual monitoring during the 3rd and 1st quarters, with status reports of work conducted during <br /> the 2nd and 4h quarters, was approved by my 8 July 2009 letter. You may contact me regarding <br /> questions by phone at (916) 464-4615; or for questions and status report submittals, by e-mail at <br /> barton w terboards.ca. ov. ( <br /> � <br /> `_ -A <br /> ames L.L. Bart <br /> Engineering Geologist <br /> UST Enforcement Unit II <br /> cc: Mr. Mark Owens, SWRCB, UST Cleanup Fund, Sacramento <br /> Mr. Michael Infurna, San Joaquin County Environmental Health Department, Stockton <br /> Mr. Todd Hafner, ATC Associates, Inc., Modesto <br /> California Environmental Protection Agency <br /> >Za Recycled Paper <br />