My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL DORADO
>
8125
>
3500 - Local Oversight Program
>
PR0528611
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2019 4:59:05 PM
Creation date
4/2/2019 4:58:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
WORK PLANS
RECORD_ID
PR0528611
PE
2957
FACILITY_ID
FA0019235
FACILITY_NAME
J & L MARKET
STREET_NUMBER
8125
Direction
S
STREET_NAME
EL DORADO
STREET_TYPE
ST
City
FRENCH CAMP
Zip
95231
APN
19317003
CURRENT_STATUS
01
SITE_LOCATION
8125 S EL DORADO ST
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1117 Lane Pahn Avenue,Suite 201 <br /> CV �� Modesto,California 95351 <br /> 209-579-2221 <br /> Fax:209-579-2225 <br /> A 8 B O C I A T E 8 INC. <br /> will include recommendations regarding remedial technology proposed to address the groundwater <br /> impact beneath the site. <br /> The work described in this Workplan will be performed under the direction of a California Registered <br /> Professional Engineer or California Registered Geologist and will be performed in accordance with <br /> ATC's Site Specific Health and Safety Plan and Quality Control/Quality Assurance Plan on file with the <br /> SJCEHD. <br /> Once approval of this Workplan has been received, ATC will work to obtain the necessary permits for <br /> installation of the pilot test wells. ATC will notify the CRWQCB and the SJCEHD at least 48 hours prior <br /> to beginning field activities. The summary report will be submitted to the CRWQCB approximately six <br /> weeks after the completion of field activities. If you have questions or require additional information <br /> regarding this Workplan, please contact us at(209) 579-2221. <br /> Respectfully submitted, �SVONAL a - <br /> ATC Associates Inc. 0�0 SOC <br /> TODD C.HAFNER � <br /> n�J No.WW <br /> Q <br /> Todd Hafner, P. G. 9rFOP CAUFOP�\ <br /> CA Professional Geologist No. 8-0090 <br /> Jeanne Hornsey, P.E. <br /> CA Registered Civil Engineer No.47410 <br /> Attachments <br /> cc: Ms. Eugenia Valdez,J&L Market <br /> Mr. Mike Infurna, SJCEHD <br /> Pilot Testing Workplan—J&L Market ATC Associates Inc. <br /> S:...\28589\Reports ATC Project No.54.28589.0001 <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.