Laserfiche WebLink
TABLE OF CONTENTS <br /> CONTENTS PAGE <br /> 1.0 INTRODUCTION/HISTORY . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 <br /> 2.0 BACKGROUND TECHNICAL DATA . . . . . . . . . . . . . . . . . . . . . . . . . . 2 <br /> ' 2 1 Site Owner and Contact Person 2 <br /> 22 Map Showing Site Location 2 <br /> ' <br /> 23 Layout of All Underground Tank and Piping Systems 2 <br /> 2 4 Laboratory Results for Initial Soil and Groundwater Sampling 2 <br /> 25 Estimates of Liquid Quantity and Composition Leaked . 2 <br /> ' 2 6 Topography, Geology, Hydrology 2 <br /> 3.0 PROPOSED FIELD WORK - METHODS AND PROCEDURES . . . . . . . . . 3 <br /> ' 3 1 Health and Safety Plan 4 <br /> 3 2 Soil Borings 4 <br /> ' 3 3 Monitoring Well Installation 5 <br /> 3 4 Monitoring Well Development 6 <br /> 3 5 Wellhead Survey 6 <br /> * 3 6 Fluid Level Measurement 6 <br /> 3 7 Groundwater Sampling 6 <br /> ' 3 8 Project Schedule 7 <br /> 4.0 REFERENCES . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 <br /> TABLES: <br /> ' 1 - Initial Soil Sampling Analytical Results <br /> 2 - Initial Groundwater Sampling Analytical Results <br /> ' FIGURES: <br /> ' 1 - Site Location Map <br /> 2 Site Plan <br /> 3 - Site Plan with Proposed Well Locations <br /> ' 4 - Typical Monitoring Well Construction/Detail <br /> APPENDICES: <br /> I - RENSA's Quality Assurance/Quality Control (QA/QC) Plan <br />