Laserfiche WebLink
RESNA Industnes Inc <br /> Quality Assurance/Quality Control Plan <br /> Revised November 1992 <br /> ' measurements will be taken both before and after purging of each well casing volumes Once <br /> the well is purged and indicator parameters have stabilized, a sample will be collected after the <br /> water level approaches 80 percent of its initial elevation. Where water level recovery is slow, <br /> the sample will be collected after stabilization is achieved and enough water is present to fill <br /> ' sample containers <br /> rCross contamination from transferring pumps (or bailers) from well to well will be avoided by <br /> utilizing dedicated equipment Where this is not feasible, thorough cleaning of equipment will <br /> be performed between sampling rounds Sampling will proceed from the least contaminated to <br /> the most contaminated well, if information is available before sample collection, or if it is <br /> indicated by field evidence Where several types of analysis will be performed for a given well, <br /> individual samples will be collected in the following order <br /> 1. Volatile Organics <br /> ' 2 Purgeable Organic Carbon <br /> 3 Purgeable Organic Halogens <br /> 4 Total Organic Carbon <br /> ' 5 Total Organic Halogens <br /> 6 Extractable Organics <br /> 7 Total Metals <br /> ' 8 Dissolved Metals <br /> 9 Phenols <br /> 10 Cyanide <br /> The specific analytical methods be utilized for the common volatile/semivolatile to analyses are <br /> ' shown on Table 2 <br /> ' Groundwater samples will be collected with a teflon bailer with bottom emptying device. <br /> Duplicate samples will be transferred to vials or containers that meet Regional Board <br /> specifications (Table 1). Groundwater from the bailer will be transferred to the sample container <br /> QAQClon FNt. 13 <br />