Laserfiche WebLink
, <br /> OPW 71SO Overfill Materials t Important <br /> Prevention Valves r <br /> ° In order to prevent product <br /> Valve Body : Cast aluminum spillage from the Underground <br /> The CARB-certified OPW 71 SO Storage Tank (UST), properly <br /> Float : Nitrile rubber, closed cell foam maintained delivery equipment <br /> vapor tight Overfill Prevention Valve <br /> Valve : Aluminum and a proper connection at the <br /> is designed to prevent the overfill of tight-fill adaptor are essential , <br /> underground storage tanks by providing Seals : Viton ® I Delivery personnel should <br /> a positive shut-off of product delivery, Upper & lower Drop Tube : Aluminum be managed and trained <br /> to inspect delivery elbows <br /> The shut-off valve is an integral part of Plastic parts : Acetal and hoses for damaged and <br /> the drop tube used for gravity filling . ' ► missing parts. They should <br /> The OPW 71 SO allows easy installation Hardware : Stainless steel .�qpo t always make certain there <br /> is a ive connection <br /> (without breaking concrete) and requires Ce� �F/B�D between the adaptor and <br /> no special manholes . Features y <br /> � � elbow. If deliver equipment <br /> ♦ Simple, Easy and Quick is not properly maintained, <br /> The OPW 71 SO is a vapor-tight two- Installation — no excavation or or the elbow is not securely <br /> stage shut- off valve. When the liquid special manholes required . coupled pthe adaptor, a <br /> serious sill may result when <br /> level rises to about 95 % of tank 4* Economical — costs a fraction the DPW71SO closes, causing <br /> capacity, the valve mechanism is a hazard and environmental <br /> released , closing automatically with of expensive, complicated and contamination . <br /> the flow. This reduces the flow rate to difficult-to- install valves. <br /> approximately 5 gpm through a bypass ♦ Furnished Complete — supplied , NOTE: The OPW 71 SO is <br /> valve. The operator may then stop the with new upper and lower drop tubes, designed for use on tight-fill <br /> gravity drop applications only. <br /> filling process and disconnect and drain mounting hardware and thorough Do not use for pressure <br /> the delivery hose. As long as the liquid instructions for quick job site time. fill applications. <br /> exceeds the 95 % level , the valve will ♦ Completely Automatic Operation <br /> close automatically each time delivery — no prechecks to perform , no resets ♦ Retrofits Directly — for both new <br /> is attempted . and no overrides to be broken and existing tanks with 4 " fill risers. <br /> If the delivery is not stopped and the or abused . <br /> liquid rises to about 98 % of tank ♦ No Pressurization of the Tank — Quick Drain Feature — <br /> ca <br /> capacity; the bypass valve closes automatically drains hose when head <br /> p yp operates directly from liquid level . pressure is relieved . <br /> completely. No additional liquid can flow ♦ Will Accept a Dipstick <br /> into the tank until the level drops below for Gauging <br /> a reset point. <br /> NOTE : The 71 SO Overfill Prevention <br /> Valve can be adjusted to shutoff at any Advantages of Overfill Prevention <br /> desired tank capacity. Please contact the Compared to Overfill Warning Systems: <br /> Authority Having Jurisdiction (AHJ) and ♦ Completely Automatic faster fill times and reducing <br /> review local , state, and national codes to Operation — does not rely on the spill risk . <br /> determine the regulatory requirements alertness or speed of response of the ♦ Speeds Delivery Operations <br /> governing shut- off capacity in your delivery attendant for certainty of product flows unimpeded into <br /> region , as well as take into account overfill prevention . p p <br /> other considerations such as extreme the tank until the hose " kick " that <br /> tank tilt. In all cases, the upper tube ♦ Keeps the Top of UST " Dry, " accompanies the valve shut-off <br /> must protrude into the tank at least per EPA Requirements — provides a clear signal that the <br /> 6 112 " to ensure that the valve can shut eliminating possible leaks at loose liquid has reached the shut-off level . <br /> off flow into the tank completely before bung fittings and the need for ♦ Simple and Inexpensive <br /> the top of the tank is wetted as per double containment on vent lines. Installation — in both two-point <br /> EPA requirements. ♦ Does Not Rely on Pressure in and coaxial fill applications, no <br /> the UST to Stop Flow — allowing additional excavation, manholes or <br /> 71 SO Instruction Sheet Order vent piping are required . <br /> Number : H15524PA <br /> Look for this label for <br /> Listings and 0= U C Prase , ¢uR ad authentic OPW EVR <br /> Approved products. <br /> Certifications Resources Board californiaAir <br /> o 0PW 7150 is EVR Approved for E85 <br /> 104 CDOIhW� on-Glendale Road r Ohio USA 45011r : 11 ( 800 ) 421 3297 <br /> •E'er <br />