My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MARIPOSA
>
2132
>
2300 - Underground Storage Tank Program
>
PR0231669
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2019 11:44:16 AM
Creation date
4/9/2019 9:55:42 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0231669
PE
2361
FACILITY_ID
FA0001480
FACILITY_NAME
TESORO (MOBIL) 68222
STREET_NUMBER
2132
STREET_NAME
MARIPOSA
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
17306035
CURRENT_STATUS
01
SITE_LOCATION
2132 MARIPOSA RD
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WALTON � NMI, <br /> MOR NEEL31NGo NN Cw <br /> Date , <br /> Owner, -'� o <br /> 0' <br /> Facility : ° <br /> T- - <br /> OPW Overfill Model Number: <br /> Part 1 - Proper Height Setting Calculation <br /> Tank 1 Tank 2 Tank 3 Tank 4 <br /> Maximum Tank Volume Per; A Gallons <br /> Max shut off requirement for flapper is 95% n 953'0 q� <br /> Multiply Max tank volume by 95% C Gallons a 3 � &LI� LT <br /> Use tank chart or ATG to determine height of �✓'7 ,* <br /> calculated volume D Inches c . oor3 ZS �&jrj;b <br /> Measure top of fill riser threads , or face seal E Inches <br /> adapter <br /> Tank diameter (From Tank Chart) F Inches ez <br /> Upper Tube in Tank (G) F-D = G G Inches e ��• % rr 76 " <br /> Subtract 2" from upper tube in tank G-2 K K Inches ! X3 <br /> 3 <br /> Calculated minimum upper tube length (I) <br /> K+E�.I Inches <br /> Actual measured upper tube length (Without <br /> . fill adapter) (J) J Inches <br /> Part 2 - Device Certification Criteria Evaluation <br /> Does the overfill prevention device meet the 95 % <br /> requirement? <br /> Is the actual measured upper tube length 6,5 inches or <br /> more than the fill riser? (J must be 6 .5 " or more than E) <br /> Does the overfill prevention device function as required? . <br /> (Inspect the device for damage, contamination, freedom of <br /> movement, weakening due to wear and corrosion <br /> Device Certification PASS / FAM <br /> Technician certifies that the device is operationally compliant.- NII ROM ' <br /> Signature of Technician : Date .. <br />
The URL can be used to link to this page
Your browser does not support the video tag.