My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL 1995
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CAPITOL
>
6421
>
2300 - Underground Storage Tank Program
>
PR0231706
>
INSTALL 1995
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2019 3:37:18 PM
Creation date
4/10/2019 1:40:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
1995
RECORD_ID
PR0231706
PE
2361
FACILITY_ID
FA0000485
FACILITY_NAME
FLAG CITY CHEVRON
STREET_NUMBER
6421
STREET_NAME
CAPITOL
STREET_TYPE
AVE
City
LODI
Zip
95242
APN
05532024
CURRENT_STATUS
01
SITE_LOCATION
6421 CAPITOL AVE
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC, HEALTH SER110ES <br />SAN JOAQUIN COUNTY <br />ENVIRONMENTAL HEA1,TH DIVISION <br />Ernest M. Fujimoto, M.D., M.P.H., Acting Health Officer <br />445 N. San Joaquin Street • P.O. Box 388 o Stockton, CA 95201-0388 <br />(209) 468-3420 <br />c <br />MEMORANDUM <br />1 'gate March 13 1995 <br />From Michael Kith, Sr REHS <br />San Joaquin County <br />` Environmental Health Division <br />N <br />To Mike Flores <br />Stockton Service Station & Equipments <br />Re : Installation plan for Flag City Chevron, 6421 Paddock PI, Lodi. <br />J <br />Upon reviewing the installation plan for the above facility, the following deficiencies were <br />observed <br />C9u` Specify what(tank) §J�will be used. <br />8 <br />Submit information on UL listed status for the proposed Eviron dispenser <br />sump for gasoline and alcohol compatibility. <br />Provide the location for the monitoring panel. <br />Specify in writing what kind of probes will used and their locations. Vic✓ <br />proved -for primary pips <br />cross sectional diagram. c r, <br />Calculation for tank anchoring and hold-down must be certified by _a <br />ns ed engineer unless it comes from the manufacture. b�`', <br />w; <br />the pump shut off completely when the alarm is activated, leak is <br />dimer --the monitoring system is disconnected? If so,, submit <br />explanation and diagram. <br />In future plan submitted to PHS-EHD must contained all information <br />specified on PHS-EHD UST installation guideline <br />G <br />A Division ol" San Joaquin County Health Care Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.