Laserfiche WebLink
L <br /> KNOLOG VacuTectT"" TEST REPORT <br /> S.O. # 106339 <br /> ;,JLOGY FOP TANKS <br /> '.HFIA EN',::P.ONMENT <br /> Date 12/14 <br /> Owner CHEVRON Site # <br /> Phone <209> 367 - ?33'- <br /> Invoice <br /> 67 - 33:,'.Invoice Name/Address ADDLE CITY CHEVRON 6421 PADDOCK PLACE LODI , CA 95242 <br /> Attn: DICK POKIDRS <br /> Site Name/Address SADDLE CITY CHEVRON 6421 PADDOCK PLACE LODI . CA <br /> TANKS LINES Leak Det <br /> See Ullage TANKS and LINES Tested to CFR-40 Parts <br /> Diag. Tank Dipped Dipped Probe Water Bubble Air Line Final Exist 280-281 &NFPA 329 Specs. <br /> For Dia.& Water Product Water Ingress Ingress Ingress TANK Line Delivery LINE LINE Leak LINE LD(s) NEW <br /> Material Level Level Level Detected Detected Detected ■ Material Sysl.Type TEST TEST Rate ■ Pass/ LD(s) <br /> �c ST/ ■ ■ ■ ■ ■ ■ Tight IN ■ ■ ■ ■ Tight Fail/ Tested <br /> FRP/ START START START or ST/ START END or or & Other: <br /> k Tank Tank <br /> # Product Capacity Lined END END END Yes/No Yes/No Yes/No Fail Line# FRP PS/SS/GS TIME TIME GPH Fail NONE PASS <br /> Iameter <br /> Exist LD SN/MDL/MFG' <br /> teriaNew/2nd LD SN/MDL/MFG: <br /> Mal Percent o Fill at Pump <br /> Start Time: Time of Test: Mfg.: LINE TEST PSI <br /> Tank Probe Inclinometer Dispenser Shear Valves <br /> End Time: Test PSI: Entr : Decrees: Operate es/no <br /> ameter <br /> Exist LD SN/MDL/MFG'. <br /> New/2nd LD SN/MDL/MFG: <br /> aterialercent O ill at Pump LINE TEST PSI <br /> Start Time: Time of Test: Mfg.: <br /> ank Probe Inclinometer Dispenser Shear Valves <br /> End Time: Test PSI: Entr : De rees: Operate es/no <br /> �aterial <br /> eter <br /> Exist LD 5N/MDL/MFG' <br /> New/2nd LD SN/MDL/MFG: <br /> 7ercent of Fill at Pump LINE TEST PSI <br /> Start Time: Time of Test. Mfg.: <br /> ank robe Inclinometer Dispenser Shear Valves <br /> End Time: Test PSI: Entry: Degrees o este es/no <br /> Diameter <br /> Exist LD SN/MDL/MFG' <br /> New/2nd LD SN/MDL/MFG: <br /> aterial Percent of Fill at Pump LINE TEST PSI <br /> Start Time: Time of Test: Mfg.: <br /> an robe Inclinometer Dispenser Shear Valves <br /> End Time: Test PSI: Entr : De rees: o este es/no <br /> ameter <br /> Exist LD SN/MDL/MFG'. <br /> New/2nd LD SN/MDL/MFG: <br /> aterialcent o ill at Pump LINE TEST PSI. <br /> Start Tier <br /> me: Time of Test: Mfg.: <br /> an robe Inclinometer Dispenser Shear Valves <br /> End Time: Test PSI: Entry Degrees operate es/no <br /> ameter <br /> Exist LD SN/MDL/MFG'. <br /> New/2nd LD SN/MDL/MFG: <br /> ateria ercent O 111 at Pump <br /> Start Time: Time of Test: Mfg.'. LINE TEST PSI: <br /> ank Probe Inclinometer Dispenser Shear Valves <br /> End Time: Test PSI: EntryDer s: o este es/no <br /> Tanknology Corporation International <br /> TANKNOLOGY Region: WFSTFPN RFC~I ON Unit # State Lic. # State: 5225 Hollister St., Houston, TX 77040 <br /> NOTE: Original VacuTect Data recordings are reviewed by Tanknology's Audit Control Department and maintained on file. (800) 888-8563 • FAX (713) 690-2255 <br /> TAK-01 <br />