My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1995 - 2002
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CAPITOL
>
6421
>
2300 - Underground Storage Tank Program
>
PR0231706
>
COMPLIANCE INFO 1995 - 2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2019 11:14:19 AM
Creation date
4/10/2019 2:22:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1995 - 2002
RECORD_ID
PR0231706
PE
2361
FACILITY_ID
FA0000485
FACILITY_NAME
FLAG CITY CHEVRON
STREET_NUMBER
6421
STREET_NAME
CAPITOL
STREET_TYPE
AVE
City
LODI
Zip
95242
APN
05532024
CURRENT_STATUS
01
SITE_LOCATION
6421 CAPITOL AVE
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 Piping,system layout Trenching,bedding and backfilling <br /> Although fiberglass pipe has excellent strength,it must be protected against impact <br /> which may occur from improper handling or during backfilling. <br /> • Provide a trench width equal to the pipe diameter plus six inches on each side. <br /> Separate multiple lines by at least 4 inches.Refer to Fig.6-1. <br /> • Provide a minimum of 18 inches of select backfill between the top of the pipe and <br /> unpaved ground surfaces. <br /> • Provide a minimum of 4 inches of select backfill between the top of the pipe and <br /> A reinforced concrete pavement(4 inches minimum thickness). <br /> • Provide a minimum of 8 inches of select backfill between the top of the pipe and <br /> asphalt pavement(2 inches minimum thickness). <br /> • Slope the trench bottom evenly from the dispensers back to sumps or tanks at a <br /> minimum'A in/ft of slope. <br /> • The trench bottom must be free of hard or sharp objects. <br /> • Grade the trench bottom with at least 6 inches of select backfill to provide firm, <br /> even support for the pipe.Compact the subgrade well to prevent differential <br /> settling. <br /> • Protect the pipe from impact during backfilling and abrasion during operation by <br /> surrounding it with four to six inches of select backfill such as washed sand,pea <br /> gravel(3/4-inch maximum)or crushed stone(lfrinch maximum). <br /> • Wrap pipe lying near concrete with rubber or foam padding to avoid direct <br /> contact with the concrete. <br /> None—� <br /> Asphalt i <br /> 2(min) <br /> Concrete <br /> 4(min) <br /> - - 18(min) <br /> o' 8(min) <br /> 4(min) <br /> Fig.6-1.Use only select materials for <br /> bedding and backfilling Dualoy 30001L fuel Select backfill 6(min) <br /> handling systems.Native materials are rarely <br /> suitable and should not be used. <br /> Native—//14 WANVANN <br /> soil 4(min) 6(min) <br /> Fig.6-2.During layout,bonding and <br /> inspection,support the piping on <br /> 2x4 blocks to keep the joints clean <br /> and to keep bedding <br /> out of the pipe. <br />
The URL can be used to link to this page
Your browser does not support the video tag.