My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2003 - 2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CAPITOL
>
6421
>
2300 - Underground Storage Tank Program
>
PR0231706
>
COMPLIANCE INFO 2003 - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2019 11:42:03 AM
Creation date
4/10/2019 2:41:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003 - 2008
RECORD_ID
PR0231706
PE
2361
FACILITY_ID
FA0000485
FACILITY_NAME
FLAG CITY CHEVRON
STREET_NUMBER
6421
STREET_NAME
CAPITOL
STREET_TYPE
AVE
City
LODI
Zip
95242
APN
05532024
CURRENT_STATUS
01
SITE_LOCATION
6421 CAPITOL AVE
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
03/04/2016 01:48 FAX <br />10/23/2006 15:19 1916 J894 <br />SHIELD, HARPL : CO. <br />Z 004/006 <br />PAGE 02 <br />In addition to the submersible pump problems encountered without an in-line check valve, <br />the metering portion of the leak detector is hammered by hydraulic shock. This results in <br />many leaks going undetected., Those leak detectors are just not equiped for the job you <br />purchased them for. <br />The 99 LD -2000 is the answer you have been looking for. VMI leak detectors, with an inte- <br />grated check valve and pressure relief valve, will save money and reduce customer frustra- <br />tion at the dispenser and reduce service calls. <br />The 99 LD -2000 <br />Has A Higher Level Of Performance Over A broader Range of Burial Depth, Line Length, <br />And Piping System Types Than Any Other leak Detector <br />Additional Features <br />• Over 20% increased flow capacity <br />• Guaranteed for 24 months from date of installation to detect 3 GPH @10 PSI teak <br />• One Way Poppet flow path <br />• Reverse Ratio Piston / Poppet combination <br />• Smaller Volume - Faster Response piston size <br />• 5hortest profile leak detector available for "tight" installations <br />• All fuels ( gasoline - diesel . alcohol ) <br />• All pipelines (flexible - fiberglass - steel) up to 400 ml. resiliency <br />Exceeds EPA regulations (3 GPH @ 10 PSI) <br />• Detects leaks up to 10' above the leak detector <br />• Installs with 2 1/16" six point socket or pipe wrench <br />Increased flow Capacity <br />• The 99 LD -2000 has maximized the flow and flow path in existing, older submersible pump <br />heads. This new design allows over 20% more flow than previous LD -2000 models, maximiz- <br />ing pump performance for earlier pump heads. <br />Longest Guarantee <br />• The 99 LD -2000 shares the longest guarantee available in the industry, along with all other <br />VMI 99 LD -2000 series leak detectors. For 24 months from date of installation, the LD -2000 is <br />guaranteed to see a 3 GPH leak @ 10 PSi <br />One Way Poppet Flow Path <br />• The One Way Poppet Flow Path isolates pump turbulence from line leak detection at pump <br />startup. The hardened stainless steel poppet does not dimensionally change because of <br />thermal conditions encountered during station operation (precision metering change is <br />insignificant down to -20° F). <br />"Patent pending <br />
The URL can be used to link to this page
Your browser does not support the video tag.