My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2003 - 2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CAPITOL
>
6421
>
2300 - Underground Storage Tank Program
>
PR0231706
>
COMPLIANCE INFO 2003 - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2019 11:42:03 AM
Creation date
4/10/2019 2:41:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003 - 2008
RECORD_ID
PR0231706
PE
2361
FACILITY_ID
FA0000485
FACILITY_NAME
FLAG CITY CHEVRON
STREET_NUMBER
6421
STREET_NAME
CAPITOL
STREET_TYPE
AVE
City
LODI
Zip
95242
APN
05532024
CURRENT_STATUS
01
SITE_LOCATION
6421 CAPITOL AVE
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. Ise -Tank Gauging / SIR Equipment. /6, Check this box if tank gauging is used only for inventor j control. <br />❑ Check this box if no tank gauging or SIR equipment is iilsiallerl. <br />This section must be completed if in -tank gauging equipment is used to perfornl leak detection monitoring. <br />Cmmnlete the fallowinsr c pewief. ,or <br />❑ Yes <br />❑ <br />No* <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />Ll Yes <br />❑ <br />No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />❑ Yes <br />❑ <br />No* <br />Was accuracy of system product level readings tested? <br />❑ Yes <br />❑ <br />No* <br />Was accuracy of system water level readings tested? <br />❑ Yes <br />❑ <br />No* <br />Were all probes reinstalled properly? <br />❑ Yes <br />❑ <br />No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />.., ..— va.a..,- aa, vw.vvv, V5U1 iuc uuW HIM WnCn LUMU uCijejencles were or will be corrected. <br />G. Lane Leak Detectors (LLD): <br />Comnlete the following checklist - <br />El Check this box if LLDs are not installed. <br />Yes <br />❑ No* <br />❑ N/A <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br />(Check all that apply) Simulated leak rate: J 3 g.p.h.; ❑ 0.1 g.p.h ; ❑ 0.2 g.p.b. <br />Yes <br />❑ No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />Yes <br />❑ No* <br />Was the testing apparatus properly calibrated?_. <br />Yes <br />❑ No* <br />❑ N/A <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />❑ Yes <br />❑ No* <br />N/A <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />Q Yes <br />❑ No* <br /># N/A <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />or disconnected? <br />U Yes <br />❑ No* <br />N/A <br />For electronic LLDs, does the turbine automatically shut off, if any portion of the monitoring system malfunctions <br />or fails a test? <br />❑ Yes <br />2 No* <br />N/A <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />Lt] Yes I <br />❑ No* I <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In the Section H. <br />below, descrihe hnw and when these u- ------ 4-A <br />H. Comments: <br />y UO3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.