My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2009 - 2013
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CAPITOL
>
6421
>
2300 - Underground Storage Tank Program
>
PR0231706
>
COMPLIANCE INFO 2009 - 2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/11/2019 11:57:34 AM
Creation date
4/10/2019 3:28:15 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009 - 2013
RECORD_ID
PR0231706
PE
2361
FACILITY_ID
FA0000485
FACILITY_NAME
FLAG CITY CHEVRON
STREET_NUMBER
6421
STREET_NAME
CAPITOL
STREET_TYPE
AVE
City
LODI
Zip
95242
APN
05532024
CURRENT_STATUS
01
SITE_LOCATION
6421 CAPITOL AVE
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
332
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Conditions for N-714-1-4 (continued) <br /> Page 3 of 4 <br /> 1.I_ If Franklin Fueling Systems (F'FS)PV-Zero pressure/Vacuum vent valve is installed,the permittee shall conduct the <br /> following maintenance for the pressure vacuum vent valve, at least once every 12 months: 1) visually inspect the <br /> housing,pipe fittings, and rain cap for obvious signs of damage,missing pafts,or fluid leaks,2)visually inspect the <br /> rain Cap,from ground level, for signs of bird nests or insect activity, and 3) ain and inspect the fill fluid per the <br /> "Fluid Inspection Procedure" described in the Executive Order specified in this permit. [District Rulc 4621] <br /> 15. Periodic maintenance inspections of the Phase II vapor recovery system shat include, at a minimum,verification that <br /> 1)the fueling instructions required by this permit are clearly displayed with the appropriate toll-free complaint phone <br /> number and tonic warning signs;2)the following nozzle components are in Place and in good condition as specified in <br /> ARl3 Executive Order as applicable; faceplate/facecorte, bellows,latching device spring, vapor check valve, spout <br /> (proper diameterlvapor collection holes),insertion interlock mechanism,automatic shut-off mechanism, and hold open <br /> latch(unless prohibited by law or the local fire control authority); 3)the hoses are not torn, flattened or crimped;4)the <br /> vapor path of the coaxial hoses associated with bellows equipped nozzles dos not contain more than 100 ml of liquid <br /> if applicable; and 5)the vapor processing unit is functioning properly,for operations that are required to have or <br /> Possess such a unit. [District Rule 46221 <br /> 16. .In the event of a separation due to a drive off, the permittee shall,unless otheiwise specified in the applicable ARB <br /> Executive Order,conduct a visual inspection of the affected equipmew and rt place the affected nozzles,coaxial hoses, <br /> breakaway couplings, and any other damaged components with new or cortifid rebuilt components that are ARL <br /> certified. The activities shall be documented in accordance with the requirem nts of this peinnit before placing the <br /> affected equipment back in service. [District Rule 4622.] <br /> 17_ The gasoline throughput for this permit unit shall not exceed 7,884,000 gallons in any one calendar year, [District Rule <br /> 2201] <br /> 18. The permittee shall conduct all periodic vapor recovery system performance tests specified in this permit,no more than <br /> 30 days before or after the required compliance testing date, unless otherwiserequired under the applicable ARL <br /> Executive Order. [District Rules 4621 and 4622] <br /> 19. The permittee shall perform and pass a Static Torque of Rotatable Phase I Adaptors test using ARB procedure TP- <br /> 201.IB within 60 days after initial start-up and at least once every 36 months t ercafter. [District Rule 462 1] <br /> 20. The permittee shall perform and pass a Pressure Integrity of Drop Tube Drain 1Valve Assembly Test using ARB TP- <br /> 201.1C or a Pressure Integrity of Drop Tube Overfill Protection Devices Test tising ARB TP-201.ID if an overfill <br /> protection device is installed, within 60 days after initial start-up and at least once every 36 months thereafter. [District <br /> Rulc 4621] <br /> 21. The permittee shall perform and pass a Static Leak Test for Underground Tanks using ARB TP-201.3 in accordance <br /> with the Executive Order specified in this permit for the Phase 11 Vapor Recov ry System within 60 days after initial <br /> start-up and at least once every 12 months thereafter, [,District Rules 4621 and 622] <br /> 22. The permittee shall perform and pass a Dynamic Back Pressure'fest using A TP-201.4 within 60 days after initial <br /> start-up and at least once every 12 months thereafter. [District Rule 4622] <br /> 23. The permittee shall perform and pass a Liquid Removal Test using the test procedure defined in the Executive Order <br /> specified in this pen-nit for the Phase II Vapor Recovery System within 60 days after initial startup and at least once <br /> every 12 months thereafter. [District Rule 46221 <br /> 24. The permittee shall perform and pass a Nozzle Bag Test using the test procedum defined in the Executivc Order <br /> specified in this permit for the Phase II Vapor Recovery System within 60 days after initial startup_ [District Rule <br /> 4622] <br /> 25. The permittee shall perform and pass a Vapor Pressure Sensor Verification Tes using the test procedure defined in the <br /> Executive Ordcr specified in this permit for the Phase II Vapor Recovery Syste within 60 days after initial startup <br /> and at least once every 12 months thereafter. [.District Rule 46221 <br /> 26. The permittee shall perform and pass a Vapor Polisher Operability Test using t I test procedure defined in the <br /> Executive Order specified in this permit for the Phase 11 Vapor.Recovery Systc within 60 days after initial startup <br /> and at least once every 12 months thereafter. [District Rule 46221 <br /> CONDITIONS CONTINUE ON NEXT PAG <br /> Na�4i�. ut6[Oii 3.o9aM�(YYEftW <br />
The URL can be used to link to this page
Your browser does not support the video tag.