Laserfiche WebLink
Monitoring System Certification <br /> UST Monitoring Site Plan <br /> Site Address: FLAG CITY CHEVRON 6421 CAPITOL AVE. LODI,CA 95240 <br /> OPOO . VENTS. . . <br /> . . . . VENT SUMP. <br /> . . . . . . . . . . .. 91. . . . . . . . . . . . . . . <br /> . 87 SLAVE. O 87 MAIN. . DIESEL. . . <br /> A=ANN ULA R <br /> O O O F=FILL <br /> . . . . . . . . . . O . . . . . . . V=VAPOR <br /> P=PROBE <br /> O V O O r=SENSOR <br /> . . . . . . . . . T=TURBINE <br /> OX G � OX <br /> x X X x <br /> . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . <br /> 10. 9. . .6. .5. 2. 1. . . . . . . . . . . . . . . . . . . . . . . . . . ESTOP <br /> `. x . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> 12. 11. 8 7. .4 3. <br /> ET <br /> . X X . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> Date map was drawn:7/28/10. <br /> Instructions <br /> If you already have a diagram that shows all required information,you may include it,rather than this page,with your Monitoring System Certification. On your site plan, <br /> show the general layout of tanks and piping. Clearly identify locations of the following equipment,if installed:monitoring system control panels;sensors monitoring tank <br /> annular spaces,sumps,dispenser pans,spill containers,or other secondary containment areas;mechanical or electronic line leak detectors;and in-tank liquid level <br /> probes(if used for leak detection). In the space provided,note the date this Site Plan was prepared. <br /> Monitoring System Certification Page 4 of 4 2/21/07 <br />