Laserfiche WebLink
Comments: <br />Q 1Q en Awl A n `7�_i t] <br />Required Follow -Up Actions: <br />IV .n .A .4 <br />.INSTRUCTIONS <br />1. The monthly UST system inspection must be conducted by a Designated UST Operator who possesses a current "California <br />UST System Operator" exam issued by the International Code Council (ICC). <br />2. The Designated UST Operator must alert the UST Owner or Operator of any condition discovered during the monthly visual <br />inspection that may require follow-up actions. <br />3. A copy of this monthly inspection report must be provided to the UST Owner or Operator. <br />4 The UST Owner or Operator must maintain a copy of each monthly inspection report and all attachments for the most recent <br />12 months. The records shall be maintained on-site or, if approved by the local agency, off-site at a readily available <br />location. <br />UN -057 - 1/1 www.unidocs.org 9/26/05 <br />