Laserfiche WebLink
Hazardous Waste Tank System September <br /> Written Assessment per CCR Title 22 p <br /> Tracy Mazda,2680 Auto Plaza Way,Tracy,CA 95304 2018 <br /> J <br /> Project <br /> Tank# <br /> Dale of Inspection. <br /> Address: <br /> Lrngth' ��' <br /> Width: rat f <br /> "eight' <br /> Dtamew. <br /> Tank Volume <br /> Secondary Containment Dimensions <br /> Anclxxs <br /> Hazardous Characteristics of the Waste' <br /> Tank Mfg: <br /> Tank Configuration. f" <br /> Material of Construction r _, <br /> Snell Thickness: <br /> Piping Material <br /> Piping Diameter <br /> Pump Description. <br /> Design Standards&Calculationtij, <br /> Tank,Foundation / <br /> Tan-Flutatian: l / <br /> Tank rivst cleave: V/ <br /> Tank System Age. Y� <br /> Tank System Leak DetactioA. <br /> Tank System Corrosion Protection <br /> Tank System Overfill and Spill Pre-vert-on Equiprnent <br /> Tank System Secondary Containment- <br /> 9erondaryContdinrnrnt11 for <br /> Tank Gauge-, <br /> Tank Vents <br /> Tank System Discreparxes <br /> Tank System Cstunated Remaining Service life' <br /> SketCn on back of pugs <br /> Strandberg Associates 1(866) 388-0404 rwaterguy@rwaterguy_.com 32 <br />