My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Z
>
ZUCKERMAN
>
1181
>
2200 - Hazardous Waste Program
>
PR0505942
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/12/2024 11:46:54 AM
Creation date
4/12/2019 10:34:33 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0505942
PE
2249
FACILITY_ID
FA0007096
FACILITY_NAME
PG&E: McDonald Island Compressor Station
STREET_NUMBER
1181
Direction
N
STREET_NAME
ZUCKERMAN
STREET_TYPE
Rd
City
Stockton
Zip
95206
APN
129-310-12
CURRENT_STATUS
01
SITE_LOCATION
1181 N Zuckerman Rd
P_LOCATION
99
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\HW\HW_2249_PR0505942_1181 N ZUCKERMAN_.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
569
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 9 <br />requirements. <br />5. The protected and insulated AST systems shall have a thru-tank leak detector tube to <br />allow for physical checkup and monitoring capability between the primary and the <br />secondary containment. <br />6. The primary steel tank shall be pressurized at 5 psig during concrete encasement. <br />7. The outer surface of the primary steel tank shall be covered by a minimum of 1/4" <br />thick (6.4 mm) Styrofoam insulation panels. <br />8. The secondary containment shall consist of a 30 NEI thick (0.76 mm) High -Density <br />Polyethylene membrane enclosing the steel tank and insulation material. <br />9. The primary steel tank and the secondary containment shall be encased in six inches <br />of monolithic reinforced concrete, with minimum design strength of 4,000 and 5,000 <br />psi at 28 days depending on the tank size. The concrete design shall include the <br />following for long-term durability: air entrainment, water reducing admixture, and <br />steel reinforcement. Concrete encasements with seams will not be approved. <br />10. The protected and insulated AST systems shall be of concrete exterior and a <br />continuous and visually verifiable monolithic (seamless) pour on top, bottom, ends, <br />and sides and contain no cold joints or heat sinks (heat transfer points). The AST <br />must be shop fabricated and tested in accordance with the LJL listings. Designs that <br />use two layers of steel with insulation material between them will not be approved. <br />Aboveground Storage Tanks Specifications <br />Page 3 of 3 <br />08/OM005 <br />11. No steel or insulating material shall come in contact with the concrete or other <br />corrosive material. <br />12. All openings shall be from the top only. <br />13. All exiposed metal with the excevtion of stainless steel must be,,00wder co,*eA • corrosion. <br />14. The protected and insulated AST systems shall include a 7 or 15 -gallon powder <br />coated or stainless steel, UL listed spill containment, and shall include normally <br />closed valve to release spilled product into the primary steel tank. Spill containment <br />which route the spilled product into interstitial area will not be approved. <br />15. The protected and insulated AST systems shall have a coated concrete exterior to <br />resist weather and reflect <br />16. The protected and insulated AST systems shall have a warranty of 30 years for <br />systems 2,000 gallon capacity and larger and 20 years for systems 1,000 gallon <br />capacity and smaller with optional 30 -year warranty. <br />17. The protected and insulated AST systems design shall have been in use for a <br />minimum of ei liteen, )giears. The mam; rer <br />• system failure in 28,000 units produced. <br />18. The protected and insulated AST systems shall have two (2) bolts for connecting <br />grounding conductors for lightning protection in accordance with NFPA 780. <br />
The URL can be used to link to this page
Your browser does not support the video tag.