Laserfiche WebLink
6 46 <br />ties are designed •withstand flooding • e maximum probable <br />seismic <br />The existing tanks are pumped an average of 2 times per month (4 <br />loads per station each occasion) during the rainy season of <br />December through March * After the new tanks are installed.to col- <br />lect the rain water run-off separately, it is estimated that <br />pumping will still be required approximately 2 times per month. <br />PG&E <br />in • • Vista <br />_x <br />water to Injection Systems in Woodland for disposal. Future con- <br />tract transport will be by licensed haulers to an approved dis- <br />s• <br />mcdona1d.100 <br />11-23-87 <br />f <br />ERNIE RALSTON <br />LAND PLANNING ANALYST 1401 FULTON STREET <br />LAND DEPARTMENT FRESNO. CA 93760 <br />SAN JOAQUIN VALLEY REGION ,2091443-5997 <br />PACIFIC GAS AND ELECTRIC COMPANY CO 021 5497 <br />