Laserfiche WebLink
PCB/OIL SPILL or LEAK REPORT16 <br />Cleanup Performed By PG&E Crews? Yes ❑ No (Name of Contractor) <br />Number of people involved in cleanup: PG&E Employees 3 Contractor Employees ^ Other (Describe) <br />Page 5 Of 6 <br />(Rev. 12/94) <br />Protective Clothing Utilized During Cleanup: f� Tyvek Coveralls ;4 Plastic Booties � Solvex Gloves ❑ Respirators <br />❑ Other (Describe) <br />Post cleanup Sampling Required? ❑ Yes (Complete below or attach a copy of the Sketch/Grid and of laboratory analysis results) <br />14 No (Explain why) <br />ko ►c) Yo G' Ke G <br />Oi f - SIP -.tied a.4L d S47nU <br />Post cleanup Laboratory Analysis Results: Number. of soil samples analyzed Alo -'r- Highest level reported ppm <br />Number of Wipe samples analyzed No'n,f. Highest level reported ug/100 sq.cm <br />Number of liquid samples analyzed_Alc2w Highest level reported ppm <br />(Copies of all Laboratory Analysis Reports should be attached to this jorno <br />Were adverse conditions encountered that delayed the start of cleanup for a High Concentration PCB's ( 500 ppm or greater) or Low Concentration PCB's involving one <br />(1) pound or more of PCB spill for more than 24 hours or the completion of cleanup for a Low Concentration PCB's (50-500 ppm) spill within 48 hours? XNo <br />❑ Yes (Describe adverse conditions that caused the delay) <br />Date of Delay, <br />Time of Delay <br />Length of Delay, <br />CLEANUP CERTIFICATION <br />(Certification is required for all Federal low and high concentration PCB spills) <br />Under civil and criminal penalties of law for the making or submission of false or fraudulent statements or representations (18 U.S.C. 1001 and 15 U.S.C. 2615) I <br />certify that the information contained in or accompanying this document is true, accurate and complete. As to the identified section(s) of this document for which I <br />cannot personally verify truth and accuracy, I certify as the company official having supervisory responsibility for the persons who, acting under my direct instructions, <br />made the verification that this information is true, accurate and complete. d <br />Cleanup has been completed in accordance with the requirements of 40 CFR 761 and/or CAC Tide 19 as described above on nt �� Y at �- I �� L'. <br />W444-- <br />� 9 (enter date) (enter time) <br />Certified By: Y` ��"'" �O L e't -D. GO iS &'d <br />(type or print certifying supervisor's name) (signature) <br />