My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
BESSEMER
>
1019
>
2800 - Aboveground Petroleum Storage Program
>
PR0515715
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2019 2:52:03 PM
Creation date
4/12/2019 10:43:59 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0515715
PE
2832
FACILITY_ID
FA0010328
FACILITY_NAME
MOUNTAIN VALLEY EXPRESS INC
STREET_NUMBER
1019
STREET_NAME
BESSEMER
STREET_TYPE
AVE
City
MANTECA
Zip
95337
APN
22104067
CURRENT_STATUS
01
SITE_LOCATION
1019 BESSEMER AVE
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
99
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TABLE 2 <br /> SPCC Cross-Reference <br /> MOUNTAIN VALLEY EXPRESS <br /> 1019 Bessemer Avenue, Manteca, California <br /> Provision Plan Section Page <br /> 112.3(d) Professional Engineer Certification 3 <br /> 112.3(e) Location of SPCC Plan 4 <br /> 112.5 Plan Review 4, Table 1-1 <br /> 112.7 Management Approval 3 <br /> 112.7 Cross-Reference with SPCC Rule Table 1-2 <br /> 112.7(a)(3) General Facility Information, Tables: Locations and Site Plan 8, Appendix A <br /> 112.7(a)(4) 5.4 Discharge Notification 22, Appendix J <br /> 112.7(a)(5) 5.0 Discharge Response 19 <br /> 112.7(b) 3.4 Potential Discharge Volumes and Direction of Flow 10 <br /> 112.7© 3.5 Containment and Diversionary Structures 10 <br /> 112.7(d) 3.6 Practicability of Secondary Containment 11 <br /> 112.7(e) 3.7 Inspections, Tests, and Records 11, Appendix B <br /> 112.7(f) 3.7.5 Personnel, Training and Discharge Prevention Procedures 12 <br /> 112.7(g) 3.8 Security 13 <br /> 112.7(h) 3.9 Tank Truck Loading/Unloading 14 <br /> 112.7(1) 3.10 Brittle Fracture Evaluation 14 <br /> 112.70) 3.11 Conformance with Applicable State and Local Requirements 15 <br /> 112.8(b) 4.1 Facility Drainage 15 <br /> 112.8(c)(1) 4.2.1 Construction 15 <br /> 112.8(c)(2) 4.2.2 Secondary Containment 16 <br /> 112.8(c)(3) 4.2.3 Drainage of Berm Areas 16, Appendix D <br /> 112.8(c)(4) 4.2.4 Corrosion Protection 16 <br /> 112.8(c)(5) 4.2.5 Partially Buried and Bunkered Storage Tanks 16 <br /> 112.8(c)(6) 4.2.6 Inspection, Appendix B - Facility Inspection Checklists 16, Appendix C <br /> 112.8(c)(7) 4.2.7 Heating Coils 17 <br /> 112.8(c)(8) 4.2.8 Overfill Prevention System 17 <br /> 112.8(c)(9) 4.2.9 Effluent Treatment Facilities 17 <br /> 112.8(c)(10) 4.2.10 Visible Discharges 17 <br /> 112.8(c)(11) 4.2.11 Mobile and Portable Containers 18 <br /> 112.8(d) 4.3 Transfer Operations, Pumping and In-Plant Processes 18 <br /> 112.20(e) Certification Prior to TOC <br /> Notes: 'Only selected excerpts of relevant rule text are provided. For a complete list of SPCC requirements,refer to the full text of <br /> [40 CFR§112]. <br /> CFR:Code of Federal Regulations <br /> SPCCP:Spill Prevention Control and Countermeasures Plan <br /> TOC:Table of Contents <br />
The URL can be used to link to this page
Your browser does not support the video tag.