My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
ALPINE
>
1636
>
2200 - Hazardous Waste Program
>
PR0535390
>
COMPLIANCE INFO PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2019 4:03:40 PM
Creation date
4/15/2019 2:52:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0535390
PE
2220
FACILITY_ID
FA0017957
FACILITY_NAME
LMB INTERNATIONAL
STREET_NUMBER
1636
Direction
E
STREET_NAME
ALPINE
STREET_TYPE
AVE
City
STOCKTON
Zip
952052525
APN
11708007
CURRENT_STATUS
02
SITE_LOCATION
1636 E ALPINE AVE
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
113
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PqU I ly <br /> z ENVIRONMENTAL HEALTH DEPARTMENT <br /> cqc;Fo ;P Donna K.Heran,R.E.H.S. SAN JOAQUIN COUNTY Program Coordinators <br /> Director 600 East Main Street, Stockton,California 95202 Kasey L.Foley,R.E.H.S. <br /> Telephone:(209)468-3420 Fax:(209)468-3433 Robert McClellon,R.E.H.S. <br /> Jeff Carruesco,R.E.H.S. <br /> Web:www.sjgov.org/ehd Linda Turkatte,R.E.H.S. <br /> SITE HEALTH& SAFETY PLAN <br /> PART I PART II <br /> GENERAL SITE INFORMATION EVALUATION OF POTENTIAL HAZARDS <br /> 1. Site Name: Z_-4.__ -!sem 1. Chemicals Hazards <br /> Address: 36 i 7 hdz- c— nA ❑Carcinogens: <br /> Contact Personof!�(Cz—/ �yT t�a� ❑Corrosives: <br /> Phone#: 6 r 173 ❑Dusts: <br /> Proposed Date of investigation/inspection: ❑Explosives: <br /> ❑Flammables: <br /> 2. Description and brief narrative of inspection activity: ❑Inorganic Gases: <br /> ❑New UST installation ❑UAR Investigation ❑Metals: <br /> ❑Tank Closure in Place ❑Tank/Pipe Repair ❑Oxidizers: <br /> ❑Tank/Pipe Removal ❑Re-excavation ❑PCBs: <br /> ❑Sampling ❑Boring/Monitoring Well installation ❑Other: <br /> —1q_U}zardous Waste inspection ❑Tiered Permitting inspection <br /> PART III <br /> 3. Specific Site Information: REQUIRED PERSONAL PROTECTIVE EQUIPMENT <br /> Tank No.: Tank Capacity: I. Monitoring Equipment(Note:Monitoring instruments must be used for all <br /> Tank Content: Tank Age: operations unless appropriate rationale or restrictions are provided): <br /> Other: ❑Combustible Gas/Oxygen Meter <br /> ❑Detector Tubes(specify): <br /> 4. Type of Operation: i�^o F!?4=t& El Photo ionization Detector <br /> ❑Organic Vapor Analyzer <br /> 5. Release History: ❑Other(specify): <br /> Evidence of leaks/soil contamination: ❑YES ❑NO ❑None(see below) <br /> Documented Groundwater contamination: ❑YES ❑NO If monitoring instruments are not used,rationale or activity/area restrictions: <br /> Background and description of any previous investigation or incidence: <br /> 2. Personal Protective Equipment <br /> 6. Potential Health&Safety Physical Concerns:(✓all that apply&describe) Level of Protection: ❑A ❑B ❑C OD <br /> ❑Heat or Cold Stress: °F(high ambient temp.) ®Hard Hat <br /> ❑Noise Sources: ®Safety Glasses/Goggles <br /> ❑Oxygen Deficiency: N Steel toed/shank shoes or boots <br /> ❑Excavation(falls,trips,slipping,cave-ins): ❑Flame retardant coveralls <br /> � ':,-�landling and Transfer of a Hazardous Substance(fire,explosions,etc.) ®Hearing protection <br /> ❑Tyvek <br /> ❑Confined space entry(explosions): ❑Respirator: ❑APR ❑SCBA <br /> ❑Heavy equipment(physical injury&trauma resulting from moving A/P Cartridge: <br /> equipment): ®Safety vest <br /> ❑Other(specify): ❑Two-way communication <br /> ❑Other(specify): <br /> 7. Anticipated Biological Hazards: <br /> ❑Snakes ❑Insects ❑Rodents ❑Poisonous Plants PART IV <br /> ❑Other/Unknown(specify): PLAN APPROVAL <br /> 8. Narrative(provide all information which could impact Health and Safety, Plan Prepared b Date: <br /> e.g.,power lines,integrity of dikes,terrain,etc.): <br /> Plan Approved :�L/ � Date: W12- <br /> EH 23081 (6/26/2012) <br />
The URL can be used to link to this page
Your browser does not support the video tag.