Laserfiche WebLink
TL 392:-0061-01 Page 2 <br /> l <br /> soil borings will. be drilled to <br /> 6. hand auger t 11 aI <br /> .approximately 5. feet BSG near product lines; <br /> : <br /> 3. soil boring will be drilled with a hollow 9t" auger <br /> drill rig to approximately 10 feet BSG adjacent tri a <br /> waste oil UST; <br /> • S. :i-I samples will be collected from the bottom ofeach <br /> i1b. r petroleum product. <br /> 60 oring and chemically analyze.d.fo <br /> ddhstftuents; <br /> • -A technical :reportwill be prepared to document the <br /> inVestigative procedures and findings. <br /> 3.0 BACXGROUnD INFO <br /> A description of the site and project history: are.. PrO4 Ote.0 in <br /> the f 0.-Uowin.g. . spbpectiqn.s... <br /> sitg kgoagirtf The site is an inactive service <br /> station: located. .at 24.3.2.3 North Highway 99, Acampol California. The. <br /> site i.s. AMrOX.i%001y 4...5 aares :and is occupied by twobuildings,. <br /> a fudl dispenser island <br /> t1aftd and four USTs. According to Mr`. Singh <br /> there are two .1.0,000 gallon And one 6, 00Q gallon gaso!.i.no and./or <br /> diesel VOTg and one 500 cicilIon: waste oil UST. <br /> 3.2 Projejot History: Ms. Linda 'Turkatte of San Joaquin <br /> County Public Health Services-Environmental Health, Division <br /> {SJCPHS-EHD) reported (telephone conversation-April 3, 1992) that <br /> the piping system. associated with the dieseltank. failed a <br /> precision test in I.989. This failure resulted in the SJCPHS-EHD <br /> placing the site in the "Corrective Action" program. <br /> Frevio Modesto Visalia SaWWWW <br />