Laserfiche WebLink
Mr. Harlin Knoll <br /> August 13,2001 <br /> Page 2 <br /> A_filter pack of Monterey 43 graded and washed sand will be placed through the hollow <br /> stem augers as they are slowly retrieved,and until the sand reaches approximately two <br /> feet above the top of the screened interval. The well will be surged and purged by the <br /> driller, following the placement of the sand pack and prior to the installation of the well <br /> seal. Periodic surging and purging will continue until the amount of suspended sediment <br /> in the groundwater decreases and stabilizes and/or until at least five well volumes have <br /> been removed. <br /> Overlying the sand pack,two feet of hydrated bentonite chips will be placed within the <br /> annular space between the borehole and thewellcasing. Over the hydrated bentonite,a <br /> surface seal of 20:1 cement;bentonite grout mixture will be installed. The top of the well <br /> will be secured with a water-tight cap and a traffic-rated, flush-mount street box. A <br /> licensed land surveyor will survey the newly-installed wellhead into the existing <br /> monitoring well network. <br /> Soil Sampling;and Analysis <br /> Turing drilling, undisturbed soil samples will be collected at 5-foot intervals using a <br /> modified California split-spoon sampler lined with two-inch diameter by six-inch long <br /> brass or stainless steel sample sleeves. A geologist will log each of the soil samples for <br /> hydrogeologic and lithologic characteristics according to the Unified Soil Classification <br /> System and screen each sample for organic vapors using a photoionization detector <br /> (PID). <br /> Since the position of the proposed well is outside of the area of the former UST,only <br /> three of the soil samples will be submitted for laboratory analysis. The samples <br /> collected at the bottom of the soil boring,within the capillary fringe(i.e.,interval of <br /> groundwater fluctuation), and from the deepest part of the unsaturated vadose'zone will <br /> be submitted for analysis. Additional soil samples may submitted for analysis,if <br /> required to adequately characterize the site. Field observations and sample selection will <br /> be reviewed with the PHSIEHD inspector,prior to sample submittal to the lab. <br /> Each soil sample will be sealed with Teflone film and plastic end caps, labeled,packaged <br /> in an iced cooler, and transported with chain-of-custody documentation to a state of <br /> California-certified hazardous waste testing laboratory for analysis. The lab will analyze <br /> each of the soil samples on a standard turn-around for Total Petroleum Hydrocarbons <br /> (TPH)-as-gasoline,benzene,toluene,ethylbenzene, xylenes(BTEX),methyl tertiary <br /> butyl ether(MTBE), di-isopropyl ether(RIPE),ethyl tertiary butyl ether(ETBE),tertiary <br /> amyl methyl ether(TAME), tertiary butanol (TBA), and 1,2-dichloroethane(1,2-IBCA) <br /> by EPA Method 8260B. <br />