My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005515
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
24323
>
3500 - Local Oversight Program
>
PR0544358
>
ARCHIVED REPORTS_XR0005515
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:50:25 PM
Creation date
4/17/2019 3:09:48 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005515
RECORD_ID
PR0544358
PE
3528
FACILITY_ID
FA0021623
FACILITY_NAME
JAHANT FOOD AND FUEL
STREET_NUMBER
24323
Direction
N
STREET_NAME
STATE ROUTE 99
City
ACAMPO
Zip
95220
APN
00516019
CURRENT_STATUS
02
SITE_LOCATION
24323 N HWY 99
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 2 2 Preliminary Investigation and Evaluation <br /> On June 16, 1999, Ramage Environmental submitted Work Plan, Environmental Site <br /> Investigation On July 20, 1999, PHS/EHD approved the work plan <br /> On November 18, 1999, Ramage Environmental supervised the drilling of one soil boring (SB-1) <br /> to a depth of 83 feet, at the north end of the middle former UST (Figures 2) Laboratory analysis <br /> of sod samples collected during drilling indicated that except for trace concentrations of toluene, <br /> ethylbenzene and xylenes, impacted soil at this location is concentrated above 25 feet bgs <br /> Groundwater was encountered in SB-1 at a depth of 78 5 feet Using a temporary well, <br /> groundwater was purged and sampled from SB-1 Results of the laboratory analysis indicated <br /> that groundwater was impacted with 130 micrograms per liter (µg11) of TPH-as-gasoline, 1 9 µgll of <br /> toluene, 1 4 µg11 of ethylbenzene, and 9 5 µg/l of xylenes Benzene, oxygenate compounds, and <br />' 1,2-dfchloroethane (1,2-DCA) were not detected These results are summarized in Table 2 <br /> On November 18, 1999, Ramage Environmental sampled groundwater from the on-site domestic <br /> well The laboratory results, summarized in Table 2, indicated that the domestic well had not <br /> been impacted by gasoline constituent compounds <br /> On January 6, 2000, Ramage Environmental documented the results of the drilling and sampling <br /> in Environmental Site Investigation Report Due to the proximity of the domestic well to the <br /> impacted groundwater, Ramage Environmental recommended that three on-site monitoring wells <br /> be installed and sampled on a quarterly basis for at least one year, and that a sensitive receptor <br /> rsurvey be conducted On January 27, 2000, PHS/EHD approved these recommendations and <br /> requested that this subject work plan be submitted <br />' 1 2 3 Monitoring Well Installations <br /> On March 30, 2001, Ramage Environmental published Monitonng Well Installation Report, which <br /> documented the permitting, installing, surveying, monitoring and sampling of three on-site <br />' monitoring wells (MW-1, MW-2 and MW-3), and the sampling of the on-site domestic water supply <br /> well The well locations are shown on Figure 2 <br /> • 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.