Laserfiche WebLink
1 <br /> TABLE OF CONTENTS <br />' Executive Summary 4 <br /> 1 0 Introduction 5 <br /> 1 1 1 Site Location and Description 5 <br /> 1 2 Previous Work 5 <br /> 1 2 1 Removal of UST System, Soil Sampling, and Over-excavation 5 <br /> 1 2 2 Preliminary Investigation and Evaluation 8 <br /> 1 2 3 Monitoring Well Installations 8 <br /> 1 2 4 Sensitive Receptor Survey 9 <br /> 2 0 Scope of Work 11 <br /> 2 1 Project Planning 11 <br /> 2 2 Groundwater Monitoring Well Installation 11 <br /> 2 2 1 Monitoring Well Construction, Development and Survey 11 <br />' 2 2 2 Soil Sampling and Analysis 12 <br /> 2 2 3 Groundwater Monitoring, Sampling and Analysis 12 <br /> 2 2 4 Waste Storage and Disposal 13 <br /> 2 3 Domestic Well Sampling and Analysis 13 <br /> 3 0 Results of the Investigation 14 <br /> 3 1 Geology and Hydrogeology 14 <br /> 3 2 Sod and Groundwater Analytical Results 14 <br /> 4 0 Conclusions and Recommendations 15 <br /> 1 <br /> 1 <br />