Laserfiche WebLink
■ <br /> ACTIVITY/ MILESTONE 1 1 2 3 4 5 <br /> Project Authorization <br /> Prepare Contract Documents <br /> Obtain Bids for Remediation Contract <br /> Permitting <br /> Start Remediation <br /> Demolition <br /> Baseline Data Acquisition <br /> Excavation <br /> Install Groundwater Treatment Equip <br /> Soil Treatment <br /> Groundwater Pumping & Treatment <br /> Start Site Restoration <br /> Demobilize G W Treatment Equip <br /> Backfill Remedial Excavation <br /> Repave Site <br /> Install Replacement Monitoring Wells <br /> Site Restoration Complete <br /> i <br /> Post Soil Remediation Eng Report <br /> Quarterly Groundwater Monitoring <br /> i <br /> Quarterly Status Reports <br /> Remediation Complete amediation Complete <br /> " Issue Closure Report <br /> I Closure Report <br /> Regulatory Review <br /> Start Site Closure Start Closure <br /> Well Closure Permits <br /> Seal &Abandon Wells ■ <br /> Restore Paving at Well Heads i <br /> Site Closed I Corrective <br /> f Action <br /> Complete <br /> V Project Milestone ION SCHEDULE T <br /> ® Status 1 Monitoring Report lth Street, Tracy, California <br /> .�, Engineering Report <br /> Project Number 9301 014 <br /> ilpaRfy, Inc. Drawn byDJVV Date 08/14/95 <br /> i <br />