My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
E
>
EL PINAL
>
1412
>
2200 - Hazardous Waste Program
>
PR0220094
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/3/2019 4:37:31 PM
Creation date
4/18/2019 10:56:17 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0220094
PE
2247
FACILITY_ID
FA0001479
FACILITY_NAME
SUMIDEN WIRE PRODUCTS CORPORATION
STREET_NUMBER
1412
STREET_NAME
EL PINAL
STREET_TYPE
DR
City
STOCKTON
Zip
95205
APN
117-360-40
CURRENT_STATUS
01
SITE_LOCATION
1412 EL PINAL DR
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
660
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
HAL WASTE GENERATOR CONDITIONAL EXEMPTION CONDTPIONAL AUTHORIZATION PERMIT BY RULE <br /> (TTU/FT[n <br /> Closure Plan No written closure plan is required No written closure plan required unless a specified 90 day No written closure plan required unless a Title 22 CCR 67450.3(a)(13)(B)-TTU <br /> unless one or more of the generator requirement applies. specified 90 day generator requirement Title 22 CCR 67450.3(c)(11)(B)-FTU <br /> following specified 90 day applies. Closure plan requirements.The plan <br /> generator requirements applies: must be kept onsite and does not have <br /> Title 22 CCR 66265.197(a) to be approved by CUPA or DTSC. <br /> 90 day accumulation tanks and <br /> containers without secondary Title 22 CCR 67450.3(a)(13)(C)-TTU <br /> containment are subject to closure Title 22 CCR 67450.3(c)(1 1)(C)-FTU <br /> plan requirements specified in TTU-O/O shall amend the closure plan <br /> Article 7 of Chapter 15. at any time during the active life of the <br /> Title 22 CCR 66265.445(c)(1)(A) TTU(s)when changes in operating <br /> Drip pads(w/o liners)from wood plans or TTU design affect the closure <br /> treatment facilities are subject to plan,or whenever there is a change in <br /> closure plan requirements. the expected year of closure. <br /> Title 22 CCR 66265.1102(a) FTU-Amendments to the closure plan <br /> Containment building are subject must comply with Section 66265.112(c). <br /> to closure plan requirements. <br /> Closure Time Notification of closure may be- Same as generator requirements plus: Same as generator requirements plus: Title 22 CCR 67450.3(a)(13)(D)-TTU <br /> Requirements required by some local ordinances. Title 22 CCR 67450.3(c)(11)(D)-FTU <br /> &Notification H&SC 25201.5(d)(8)(A) H&SC 25200.3(g)(1) O/O shall treat,remove or dispose of all <br /> Upon terminating operations,the generator shall initiate closure Upon terminating operations,the generator hazardous waste within 90 days after <br /> activities by removing all waste residues. shall initiate closure activities by removing final volume is treated. <br /> all waste residues. <br /> Title 22 CCR 67450.3(a)(13)(E)-TTU <br /> H&SC 25201.5(d)(8)(B) H&SC 25200.3(8)(2) Title 22 CCR 674503(c)(11)(E)-FTU <br /> Requires generator to provide written notification to DTSC and Requires generator to provide written Closure shall be completed within 180 <br /> the CUPA or the authorized unified program agency upon the notification to DTSC and the CUPA or the days after treating final volume of <br /> completion of all closure activities. authorized unified program agency upon the hazardous waste. <br /> completion of all closure activities. <br /> Title 22 CCR 674503(a)(13)(F)-TTM <br /> Title 22 CCR 67450.3(c)(1 1)(F)-FTU <br /> O/O shall notify CUPA(and DTSC for <br /> TTUs)or authorized UP agency 15 <br /> days prior to completion of closure. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.