My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
O
>
ORANGE
>
529
>
1900 - Hazardous Materials Program
>
PR0520113
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2019 4:50:12 PM
Creation date
4/19/2019 10:27:54 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1900 - Hazardous Materials Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0520113
PE
1921
FACILITY_ID
FA0010164
FACILITY_NAME
ACE ARMATURE & MOTOR SHOP INC
STREET_NUMBER
529
Direction
N
STREET_NAME
ORANGE
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
13525006
CURRENT_STATUS
01
SITE_LOCATION
529 N ORANGE ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CERS Consolidated Emergency Response/Contingency Plan—Page 4 of 4 Rev.06/27/11 <br /> H. EARTHQUAKE VULNERABILITY <br /> dentify areas of the facility that are vulnerable to hazardous materials releases/spills due to earthquake-related motion.These areas require immediate isolation and <br /> ns ection. <br /> VULNERABLE AREAS:(Check all that apply) H1. LOCATIONS(e.g.,shop,outdoor shed,forensic lab) <br /> ❑ I.HAZARDOUS MATERIALS/WASTE STORAGE AREA 1i2 <br /> [❑ 2.PROCESS LINES/PIPING H3. <br /> ❑ 3.LABORATORY 114. <br /> Identify <br /> 4.WASTE TREATMENT AREA Hs. <br /> ienti y mechanical systems vulnerable to releases/spills due to earthquake-related motion.Theses stems require immediate isolation and inspection. <br /> (VULNERABLE SYSTEMS:(Check all that apply) 146. LOCATIONS <br /> ❑ 1.SHELVES,CABINETS AND RACKS H7. <br /> p 2.TANKS(EMERGENCY SHUTOFF) H8. <br /> px 3.PORTABLE GAS CYLINDERS H9. <br /> ❑ 4. EMERGENCY SHUTOFF AND/OR UTILITY VALVES HIO <br /> ❑ 5.SPRINKLER SYSTEMS 1411 <br /> ❑ 6.STATIONARY PRESSURIZED CONTAINERS(e.g.,Propane dispensing tank) Hie <br /> I. EMPLOYEE TRAINING <br /> xplanation of Requirement:Employee training is required for all employees handling hazardous materials and hazardous wastes in day-to-day or clean-up operations <br /> ncluding volunteers and/or contractors.Training must be: <br /> Provided within 6 months for new hires; <br /> Amended as necessary prior to change in process or work assignment; <br /> Given upon modification to the Emergency Response/Contingency Plan,and updated/refreshed annually for all employees. <br /> required content includes all of the following: <br /> Material Safety Data Sheets; • Communication and alarm systems; <br /> Hazard communication related to health and safety; • Personal protective equipment; <br /> Methods for safe handling of hazardous substances; • Use of emergency response equipment(e.g.Fire extinguishers,respirators, <br /> Fire hazards of materials/processes; etc.); <br /> Conditions likely to worsen emergencies; • Decontamination procedures; <br /> Coordination of emergency response; • Evacuation procedures; <br /> Notification procedures; • Control and containment procedures; <br /> Applicable laws and regulations; • UST monitoring system equipment and procedures(if applicable). <br /> INDICATE HOW EMPLOYEE TRAINING PROGRAM IS ADMINISTERED(Check all that apply) <br /> Q 1. FORMAL CLASSROOM; [12. VIDEOS; 3. SAFETY/TAILGATE MEETINGS; <br /> � c}4. STUDY GUIDES/MANUALS(Specify): 12. <br /> []5. OTHER(Specify): 13. <br /> ❑6. NOT APPLICABLE BECAUSE FACILITY HAS NO EMPLOYEES <br /> Large Quantity Generator(LQG)Training Records: Large quantity hazardous waste generators (i.e., who generate more than 270 gallons/1,000 kilograms of <br /> hazardous waste per month)must retain written documentation of employee hazardous waste management training sessions which includes: <br /> • A written outline/agenda of the type and amount of both introductory and continuing training that will be given to persons filling each job position having <br /> responsibility for the management of hazardous waste(e.g.,labeling,manifesting,compliance with accumulation time limits,etc.). <br /> • The name,job title,and date of training for each hazardous waste management training session given to an employee filling such a job position;and <br /> • A written job description for each of the above job positions that describes job duties and the skills,education,or other qualifications required of personnel assigned <br /> to the position. <br /> • Current employee training records must be retained until closure of the facility. <br /> 91 Former employee training records must be retained at least three years after termination of employment. <br /> J. LIST OF ATTACHMENTS <br /> ((,heck one of the following) J1 <br /> K 1. NO ATTACHMENTS ARE REQUIRED;or <br /> 2. THE FOLLOWING DOCUMENTS ARE ATTACHED: J2 <br /> l <br /> K. SIGNATURE/CERTIFICATION <br /> C rtificat' n: Based on my inquiry of those individuals responsible for obtaining the information,I certify under penalty of law that I have personally examined and <br /> famil'1rwith the information submitted and believe the information is true,accurate,and complete,and that a copy is available on site. <br /> SI3 NA CRFIOF OWNER/OPERATOR DATE SIGNED 1 `Iq Kt. <br /> 1 i <br /> N MEfl`SIGN R(print) T� K2. TITLE OF SIGNER 'l K3. <br />
The URL can be used to link to this page
Your browser does not support the video tag.