Laserfiche WebLink
�PaU '" c 1 SAN J A Q U N Environmental Health Department <br /> a { k `= <br /> " is COUNTY Linda Turkatte, REHS , Director <br /> O1�iP/ Greatness grows here . Kasey Foley, REHS, Assistant Director <br /> PROGRAM COORDINATORS <br /> Robert McClellon , REHS <br /> Jeff Carruesco , REHS, RDI <br /> Willy Ng , REHS <br /> Muniappa Naidu , REHS <br /> Michael Kith , REHS <br /> April 26 , 2019 <br /> KARL ] KARNS <br /> 16250 MEACHAM ROAD <br /> BAKERSFIELD , CA 93314 <br /> Re : YRC INC SR0080398 <br /> 1535 E PESCADERO AVE <br /> TRACY , CA 95304 <br /> The San Joaquin County Environmental Health Department ( EHD ) has completed the review of the application for a <br /> permit to replace the L14 sump sensor (which was replaced on 2/18/2019 and no EHD notification was provided ) <br /> with a Veeder Root sensor (#208) on the underground storage tank ( UST) system at the above noted address . The <br /> permit has been approved with the following conditions : <br /> 1 . Contact the local fire department and the San Joaquin Valley Air Pollution Control District for any <br /> applicable permits and requirements . <br /> 2 . Any changes in information and scope of work must be submitted to EHD for approval prior to <br /> commencing work. All new addenda supersede the previous ones . <br /> 3 . This sensor was tested on 2/19/2019 ; if it was tested with passing results no further testing is required <br /> for this sensor replacement at this time . If this sensor was not tested with passing results , the following <br /> test must be scheduled immediately, a 48 -hour EHD notification is required for all testing . <br /> • Sensor functionality : Functionality of the monitoring system must be verified to ensure that <br /> monitoring has been restored to meet the requirements of Title 23 California Code of Regulations <br /> and the Health & Safety Code . If it is determined that a cold start is necessary , a copy of the <br /> alarm history shall be printed prior to performing the " cold start" of the monitoring system and <br /> made available at the time of EHD inspection . <br /> 4 . If concrete will be broken near the tank, a secondary containment test must be performed on the <br /> tank once concrete is poured in accordance with the manufacturer' s guidelines . <br /> 1868 E . Hazelton Avenue I Stockton , California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www. sjcehd . com <br />