Laserfiche WebLink
.monitoring System Certification <br /> Site Address: 2448 W. KETTLEMAN LANE Date of Testing/Service: 09/12/2001 <br /> LOWER SACRAMENTO RD. <br /> F. In-Tank Gauging / SIR Equipment Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> Yes ®No Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br /> Yes ®No Were all tank gauging probes visually inspected for damage and residue buildup? <br /> Yes ®No Was accuracy of system product level readings tested? <br /> Yes ®No Was accuracy of system water level readings tested? <br /> ®Yes FjNo Were all probes reinstalled properly? <br /> ®Yes No Were all items on the equipment manufacturers'maintenance checklist completed? <br /> • In the Section H, below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD) <br /> Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance? <br /> ® Yes 0 No N/A (Check all that apply)Simulated leak rate: ® 3 g.p.h ❑ 0.1 g.p.h []0.2 g.p.h <br /> ® Yes F1 No Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> © Yes F-1 No Was the testing apparatus properly calibrated? <br /> ©Yes ❑No ❑N/A For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br /> F]Yes FINo' ©N/A For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑Yes F_]No' ®N/A For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br /> F]Yes F_�No ®N/A For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br /> E]Yes DNo ®N/A For electronic LLDs, have all accessible wiring connections been visually inspected? <br /> EYes E]No' Were all items on the equipment manufacturers'maintenance checklist completed? <br /> In the Section H, below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> page 3 of 3 <br />