Laserfiche WebLink
UST SYSTEM RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans& applications as originals will be retained by EHD) <br /> 1. Site map enclosed? YES= NO= <br /> 2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br /> person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br /> Plan"is available on the jobsite as required by Title 8. <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done. (If <br /> adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br /> pages 4-8 as necessary for a timely plan review): <br /> Replace annular manways. Saw cut along existing saw cut line for 3 products, (each 60" by 80"), break concrete and <br /> remove existing fill manway and annular manway for each product; set new manway; <br /> patch back with 6 sack 2500 psi natural crown and rebar into existing concrete <br /> Spill buckets to remain (see details on attached drawing) <br /> 4. List of equipment to be used(Attach manufacturer's specification sheets showing third-party approval): <br /> CNI Manways <br /> CNt Otte X tXk(_"S(!_LU <br /> 2 <br />