Laserfiche WebLink
SAN JOAQUWOUNTY ENVIRONMENTAL HEALTH ARTMENT <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN - PAGE 2 <br /> VI. DISPENSER MONITORING <br /> MONITORING OF AREAS BENEATH DISPENSER(S)IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) M50. <br /> ❑ 1.CONTINUOUS ELECTRONIC MONITORING OF UNDER DISPENSER CONTAINMENT(UDC) <br /> PANEL MANUFACTURER: M5'- MODEL#: M52. <br /> LEAK SENSOR MANUFACTURER: M53 MODEL#(S): M54. <br /> WILL DETECTION OF A LEAK INTO THE UDC TRIGGER AUDIBLE AND VISUAL ALARMS? ❑ a.YES ❑ b.NO M55. <br /> WILL A UDC LEAK ALARM TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO M56. <br /> WILL FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO M57. <br /> 2.MECHANICAL ASSEMBLY(e.g.,FLOAT AND CHAIN ASSEMBLY)IN UDC TRIPS SHEAR VALVE IN CASE OF LEAK <br /> ASSEMBLY MANUFACTURER: i;;-4J C9 M5R. MODEL#(S): M59. <br /> ❑ 3.VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY(Requires agency approval) M60. <br /> ❑ 4.NO DISPENSERS <br /> ❑ 99.OTHER(Specify) M6i_ <br /> VII. ENHANCED LEAK DETECTION <br /> ❑ 1.WE HAVE BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT WE MUST IMPLEMENT ENHANCED LEAK M7o. <br /> DETECTION(ELD)FOR THE UST(S)COVERED BY THIS PLAN.PER 23 CCR§2644.1,ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED <br /> VIII. TRAINING <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) Mao. <br /> 1. Z THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required) <br /> 2. 1 OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required) <br /> 3. THE FACILITY'S BEST MANAGEMENT PRACTICES(Required as of 1/01/2005) <br /> 4. ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS <br /> 5. ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW <br /> 6. ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION" <br /> 7. ❑ SWRCB PUBLICATION:"WEEKLY MANUAL TANK GAUGING FOR SMALL UNDERGROUND STORAGE TANKS" <br /> 99. ❑ OTHER(Specify): Ms 1. <br /> Personnel with UST monitoring responsibilities are familiar with all of the above documents relevant to their job duties and can access those documents when needed. <br /> By January 1,2005 this facility will have a"Designated UST Operator"who has passed the operator exam administered by the International Code Council(ICC). By <br /> January 1,2005,and annually thereafter,the "Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems. <br /> This training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices. <br /> ➢ The facility employee's role with regard to the leak detection equipment. <br /> ➢ The facility employee's role with regard to spills and overfills. <br /> ➢ Whom to contact for emergencies and leak detection alarms. <br /> For facility employees hired on or after January 1,2005,the initial training will be conducted within 30 days of the date of hire. <br /> IX. COMMENTS/ADDITIONAL INFORMATION <br /> Please use this section to include any additional UST system monitoring-related information(e.g.,additional information required by your local agency): Mss. <br /> TYPE OF OVERFILL PREVENTION= 1 014-4-5 a,+- 90 c7 <br /> 4hY%\j 4L A►3\JcKe-�- Tes-46- <br /> Tr�' -Ah+\Ja>, Soca-,�Ar� ce7n+q i ntK.c�.�C' Ts r <br /> X. PERSONNEL RESPONSIBILITIES <br /> AS OF 1/1/05, THE "DESIGNATEDYST OPERATOR" IDENTIFIED IN SECTION III OF THE CURRENT UST OPERATING PERMIT APPLICATION- <br /> FACILITY FORM WILL HAVE ULTIMATE AUTHORITY FOR PERFORMING THE MONITORING ACTIVITIES AND MAINTAINING LEAK DETECTION <br /> EQUIPMENT COVERED BY THIS PLAN,AND WILL PERFORM AND DOCUMENT MINIMUM MONTHLY VISUAL INSPECTIONS OF THE FACILITY'S <br /> UST SYSTEMS IN ACCORDANCE WITH 23 CCR§2715(b). <br /> XI. OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:I certify that the information provided herein is true and accurate to the best of my knowledge. <br /> OWNER/OPERATOR,SIGNATURE REPRESENTING DATE: M91. <br /> 1 ,� mer M9o. <br /> J \ 1 H+ 1'}Z ❑Operator ^ �� <br /> OWNER/OPERATOR NAME(print): M92. OWNER/OPERATOR TITLE: M93. <br /> CI n A (-G A kcl r j l-2er.a4 L. rVA" e<' e4 L .Scrvt' <br /> (Agency Use Only) This plan has been reviewed and: Approved ❑Approved With Conditions ❑Disapproved <br /> Local Agency Signature: 1i7 Date: // 1 <br /> Comments/Special Conditions: <br /> SJCEHD-d(07/03)-3/4 07/23/03 <br />