Laserfiche WebLink
a <br /> San Joaquin County <br /> oP Environmental Health Department DIRECTOR <br /> �. _,,� .o <br /> 2 G 600 East Main Street Donna Heran, REHS <br /> •2 <br /> Stockton, California 95202-3029 PROGRAM COORDINATORS <br /> Margaret Lagorio, REHS <br /> Robert McClellon, REHS <br /> c •. _ r P <br /> q�;F o.R�� Website: www.sjgov.org/ehd Jeff Carruesco,REHS, RDI <br /> Kasey Foley, REHS <br /> November 30, 2010 Phone: (209) 468-3420 --_�� <br /> Fax: (209) 464-0138 <br /> Eric Janzen <br /> Able Maintenance Inc <br /> 3224 Regional Parkway <br /> Santa Rosa, CA 95403 of 1 i <br /> Re: USA#68153 2448 W. Kettleman Ln. Lodi, CA 95242 SR0061452 <br /> The San Joaquin County Environmental Health Department (EHD) has completed the review of <br /> the application for a permit to install two Gilbarco advantage (3+1) Dispensers and two Gilbarco <br /> Advantage (3+0) Dispensers, four Bravo conversion frames, de-manifold vent risers, install <br /> OPW 23-033 vent cap on new diesel vent riser, install husky 5885 pressure/vacuum vent cap on <br /> remaining gasoline vent risers, convert the existing Premium (91) UST to contain Diesel, and <br /> convert the existing Midgrade (89) UST to Premium (91) at the above noted address. The <br /> permit has been approved with the following conditions: <br /> 1. Contact the local fire department and the San Joaquin Valley Air Pollution Control <br /> District for any applicable permits and requirements. <br /> 2. An*changes in information and scope of work must be submitted to EHD for approval <br /> pnorlo commencing work. All new addenda supersede the previous ones. <br /> 3Contact Aris Cacapit at (209) 468-3453 to arrange the following inspection appointments <br /> (a 48-hour notice is required for inspection appointments). Please be aware that <br /> ;, <br /> Jinspections for emergency work must be scheduled within five days of permit approval. <br /> a. Leak detector test: Diesel and 91 leak detectors must be tested to confirm that the <br /> device can detect a leak of 3 gallons per hour at 10 psi. <br /> ' b. Line integrity test on the diesel, 91, and 87 product lines are required if offsets will be <br /> installed. /- <br /> c. Verify vapo recov and spill container re cap��pee off. <br /> d. Verify Bravo conversion frame is installed pernGfacturer's instructions. <br /> Please be aware that the facility cannot operate the UST system prior to the EHD <br /> inspection and approval. <br /> 4. Qualified service technicians must possess or work under the direct and personal <br /> supervision of an individual physically present at the work site who possesses all of the <br /> following: <br />